450-广东电网公司中山供电局(450- Guangdong Grid Co Zhongshan Power Supply Bureau)
450-广东电网公司中山供电局(450- Guangdong Grid Co Zhongshan Power Supply Bureau)
Zhongshan Power Supply Bureau of Guangdong Grid Co
220 thousand volts, torch and other 9 projects of environmental impact assessment of power transmission and transformation project
prequalification documents
Tenderee: Zhongshan Power Supply Bureau of Guangdong Grid Co
Guangdong tendering Engineering Consulting Co., Ltd.
Two, 0, one or two, March
Catalog
I. The general situation of the project:...
1.1 the name of the project:...
1.2 scope of tender:...
Two, the applicant qualification requirements:...
Three, application documents, data, main content and format requirements:... 3
Four. Submission of Prequalification applications:...
Five, the prequalification procedure:...
Six. Qualification notice and confirmation:...
Seven, contact information:...
Eight, prequalification application documents content and reference format:... 8
I. General Situation of the project
1.1 project name: environmental impact assessment of 9 power transmission projects such as 220 thousand volts torch
1.2 tender scope:
220 thousand volt, Shaxi, torch, new wave expansion website #3 main transformer and Nakayama Kaya Hengmen power plant cogeneration project (3 * 390 thousand KW) access system, Shan to Cuiheng line 6 220 thousand kV power transmission project, 110 thousand volt comfort, 3 bay, long 110 thousand kV power transmission project environmental impact assessment, the preparation of environmental impact assessment report, with the assistance of relevant environmental protection management review, and obtain the relevant environmental impact protection administration (through) reply.
Two, the applicant qualification requirements
2.1 this prequalification requires the applicant to have both at the same time:
(1) independent legal personality with independent capacity for civil legal liability;
(2) have second class or above qualification for environmental impact assessment of power transmission and construction projec
您可能关注的文档
- 2009年河南省普通高等学校 选拔优秀专科毕业生进入本科阶段学习考试 生理学、病理解剖学(In 2009, ordinary colleges and universities in Henan Province selected excellent graduates to enter the undergraduate phase to study physiology and pathological anato.doc
- 2008年薪酬排行榜出炉(In 2008, the salary chart came out).doc
- 2009年秋季材料报价单(Material quotation for Fall 2009).doc
- 2009年高考文综(历史)模拟题(二)(Mock up (History) of the college entrance examination in 2009 (two)).doc
- 2009文档(2009 document).doc
- 2009新增病例分析内容的总结(转)(2009 summary of new case analysis).doc
- 2008年湖北高考语文试题及答案(Hubei college entrance examination language examination questions and answers in 2008).doc
- 2009病例分析公式(51个疾病)(2009 case analysis formula (51 diseases)).doc
- 2009管理学7学生用(2009 management 7 students use).doc
- 2009级临床医学计生专业专科内科学()a(2009 grade Clinical Medicine Graduate School of internal medicine (a)).doc
最近下载
- 25题固定收益分析岗位常见面试问题含HR问题考察点及参考回答.pdf
- 韶关市2025届高三一模(综合测试一) 英语试卷(含答案).docx
- 工作报告及设计心得20160831.pdf VIP
- SPC导入的钢箱截面在生成变截面时,消隐显示各板件连接错乱.pdf VIP
- Lessonsinlifesaving英国短片剧本.docx VIP
- 2019年注册土木工程师(道路工程)考前培训南京班文件-李 雪.pdf VIP
- 上海市2018-2022年近五年中考数学试卷附答案.pdf VIP
- 城轨车站施工与维护——开挖作业.pptx VIP
- 城轨车站施工与维护——围护结构施工及基坑开挖.pptx VIP
- 铁道概论——单元7.7铁路专用通信系统.pptx VIP
文档评论(0)