- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
(此文档为word格式,下载后您可任意编辑修改!)
广珠铁路SG-5标段长竹隧道
实施性施工组织设计
编制单位:
技术负责人:
编制人:
编制日期:
目 录
一、编制说明 ·················································· 1
1.1 编制依据················································1
1.2 工程概况 ···············································1
二、施工组织机构··············································· 6
2.1施工组织机构图 ··········································6
2.2岗位人员配备情况 ········································6
2.3岗位职责描述 ············································6
三、施工总体部署 ··············································8
3.1施工准备·················································8
3.2总体施工方案············································10
3.3特殊与关键工程施工方案 ·································10
3.4阶段里程碑工期计划 ·····································14
四、工期计划及施工进度安排 ····································15
4.1总工期计划··············································15
4.2施工进度安排 ···········································15
4.3工期保证措施············································15
五、主要工程项目的施工工艺流程和施工方法······················18
5.1施工方案················································18
5.2劳动力组织 ·············································44
六、主要工程材料计划 ·········································46
6.1主要材料分期供应计划 ··································46
6.2保证材料供应及应急预案措施 ····························47
6.3物资管理措施 ··········································48
6.4确保材料质量的措施·····································49
七、主要机械、试验、检验仪器设备计划··························51
7.1主要机械设备 ··········································51
7.2试验与检验仪器设备配备计划及方法 ······················52
八、施工组织措施··············································62
8.1施工准备阶段组织措施 ··································63
8.2.施工阶段组织措施 ······································63
8.3.竣工验收阶段组织措施 ··································64
九、质量保证措施 ············································65
9.1质量目标 ··············································65
9.2创优规划·····················