采煤概论 复习资料(Introduction to coal mining review materials).docVIP

采煤概论 复习资料(Introduction to coal mining review materials).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
采煤概论 复习资料(Introduction to coal mining review materials)

采煤概论 复习资料(Introduction to coal mining review materials) For the convenience of drainage, adit must have 3%~5% flow gradient. According to the relative position between adit and coal seam, they can be divided into 1 vertical adit, 2 vertical adit and 3 inclined adit. The bottom pit is a general term for a set of tunnels and chambers connecting the shaft and the main roadway or main Shimen. The transmission line at the bottom pit includes the storage line, the lane and the auxiliary line. The bottom pit can be divided into two major types: ring type and reentrant type. The ring yard can be divided into horizontal type, oblique type and vertical type. At present, there are two kinds of transportation modes of track transportation in our country: rail transportation and belt conveyor. According to the number of coal seams in the main roadway service, the layout of the main roadway can be divided into three types: stratified transportation roadway, centralized transportation roadway and grouped centralized transportation roadway. The direction of the main roadway towards the bottom of the pit should be maintained at the downhill slope of 3%%. For large displacement, Slope Roadway ditch or prevent Jie is also desirable 5%%. In the construction of roadway, the rock must be broken first. The commonly used rock breaking methods include two kinds of mechanical broken rock and blasting broken rock. Different grades of basic roof initial pressure step distance is different, generally about 20 - 35M or so. The drift along the goaf must be started after the roof of the goaf is stabilized. The site where coal mining is carried out is called coal mining face. The rock layer of the top and bottom of the coal seam constitutes the surrounding rock of the stope. The surrounding rock generally includes the following four parts: 1 pseudo roof, 2 direct roof, 3 basic roof and 4 direct bottom. The size of the first step is related to the thickness of the top, lithology, geological structu

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档