(6-3)火电厂大气污染物排放标准doc((6-3) emission standards of air pollutants in thermal power plants doc).doc

(6-3)火电厂大气污染物排放标准doc((6-3) emission standards of air pollutants in thermal power plants doc).doc

  1. 1、本文档共22页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
(6-3)火电厂大气污染物排放标准doc((6-3) emission standards of air pollutants in thermal power plants doc)

(6-3)火电厂大气污染物排放标准doc((6-3) emission standards of air pollutants in thermal power plants doc) 1 range This standard specifies the maximum allowable number of power plant emissions of sulfur dioxide, smoke concentration and blackness, the provisions of the maximum allowable emission concentration of the third period of thermal power plant sulfur dioxide and nitrogen oxides. This standard is applicable to a single output of more than 65t/h in dust combustion furnace and boiler stoker furnace outside and a single output in 65t/h and below coal power boiler thermal power plant emissions management, and environmental impact assessment of construction project, design, management and completion of discharge after the completion of acceptance. 2 citation criteria The provisions of the following standards constitute the provisions of this standard by referencing them in this standard. The editions shown are valid when published in this standard. All standards will be revised. The parties to this standard shall explore the possibility of the latest version of the following standard. GB/T 161571996 particles in the exhaust of fixed pollution source determination of gaseous pollutants and sampling method. 3 definitions The following definitions are used in this standard: 3.1 standard state The state of flue gas at a temperature of 273K and a pressure of 101 325Pa. The emission concentration of all pollutants in this standard refers to the value of the standard state of dry gas. 4 technical content 4.1 year Division This standard divides the thermal power plant into three periods according to the fixed number of years: Before the time I - 1992 years or preliminary design has been completed and put into production in August 1st by the examination and approval of new, expansion, renovation of power plant; II period - 1992 years from August 1st to December 31, 1996 during the environmental impact report by the examination and approval of new, expansion, renovation of power plant, in

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档