- 1、本文档共3页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
这是精心收集的精品经典资料,值得下载保存阅读!
润扬长江大桥(Runyang Bridge)
Runyang Suspension Bridge Steel Box Girder in the last piece, the sound of firecrackers, slowly lifted, smooth place, declaration of Runyang Yangtze River Highway Bridge closure through the bridge marks the main project fully completed.
Runyang Yangtze River Highway Bridge north of South Road in Yangzhou City, across the river, south of Zhenjiang Shiyezhou leap 312 National Highway and Shanghai Nanjing Expressway, a total length of 35.66 kilometers, connecting Yangzhou and the Shiyezhou island north bridge cable tower cable-stayed structure, steel box girder has been completed in October 3, 2003. South bridge connecting Shiyezhou island and Zhenjiang as the single hole double hinged steel box girder suspension structure, steel box structure for flat streamline, beam 3 meters high, 38.3 meters wide, a total of 93 sections, a total weight of 24000 tons of steel tonnage, span 1490 meters, the longest span than Jiangyin Yangtze River bridge suspension bridge beyond 115 meters, is the first Chinese, long span suspension bridge in the world third.
From the essence of the Runyang Yangtze River on the bridge, is the perfect combination of Jiangyin Yangtze River bridge and Nanjing Yangtze River Bridge, both design and construction have reached the international advanced level.
The bridge after 42 months of construction, has completed an investment of about 4000000000, the North Bridge and South Bridge have been completed, in April 25th the main cable wrapping has entered the stage, then the engineering and technical personnel will also be on the two main cable is the dehumidifier Yinlong and vacuum, bridge traffic, landscape, building engineering has already started, with the south bridge closure through the deck pavement and projects, to completion has taken a solid step forward.
Runyang Yangtze River Highway Bridge as the national key project, after Nanjing Yangtze River Bridge, Jiangyin Yangtze River bridge and Nanjing Yangtze River Bridge, fourth b
您可能关注的文档
- 台人力调查台管理有薪照顾假逾4成上班族不敢休(Taiwan manpower survey Taiwan management paid care leave, more than 4 into office workers, dare not rest).doc
- 启迪人心10个的有关编程的至理名言(Inspirational 10 the programming of the true saying).doc
- 商品混凝土强度的配合比(Mix ratio of strength of commercial concrete).doc
- 四层电梯(Four story elevator).doc
- 图像平滑滚动效果的VC实现(VC implementation of smooth rolling effect of images).doc
- 土力学概念.txt缩减(Reduction of soil mechanics concept.Txt).doc
- 土建_文本文档(The civil _ text document).doc
- 圣夜ホーリーナイト(Cathedral at night, holy night).doc
- 塑料4(Plastic 4).doc
- 墙梁ql-53(Wall beam ql-53).doc
文档评论(0)