电站电气倒闸操作误操作原因分析(Cause analysis of misoperation of electrical switching operation in power plant).doc

电站电气倒闸操作误操作原因分析(Cause analysis of misoperation of electrical switching operation in power plant).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
电站电气倒闸操作误操作原因分析(Cause analysis of misoperation of electrical switching operation in power plant)

电站电气倒闸操作误操作原因分析(Cause analysis of misoperation of electrical switching operation in power plant) Switching operation is the power plant (substation) priority among priorities of work safety, operation personnel such as misuse occurred in the process of switching operation, light to cause the shutdown, line trip, weight is likely to cause a blackout, endangering the equipment and personal safety and power grid, and the social impact, so the switching operation the work should pay great attention to and strengthen prevention. 1. Analysis of misoperation of electrical switching operation in power plant 1), switching operation without reasonable arrangement of operating personnel, such as poor health or bad mood of the operating personnel to operate, uneven quality of the business operation personnel, safety consciousness, lack of awareness, that fill in or perform an operation ticket, take safety measures is only one task, is to cope with examination, ignore this to ensure their own interests. The electric operators carry out shift work, and the individual attendants are easily fatigued when they are working, especially after the night shift. At this point, if the operation of the switch is not upgraded, the memory error may occur and lead to an accident. 2), switching operation when the tool is not fully prepared or unqualified instruments, such as the use of ultra cycle electroscope and levers, insulating gloves leak not timely replacement, may affect the safe operation. Therefore, periodic tests must be carried out to ensure that the operating tools are in good condition. The actual work in preparation for the joint shall be in accordance with the provisions of the 2, but the actual process due to the lack of supervision and inspection procedures, operation missing thatlittle or prolong the operation time of drag in all sorts of irrelevant matters. There are even safety appliances and safety measures without lighting or other causes of electric shock or wrong separa

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档