确保砼灌注桩中钢筋笼的位置及防止其上浮的方法(Method for ensuring the position of reinforcing steel cage in concrete pouring pile and preventing floating).doc
- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
确保砼灌注桩中钢筋笼的位置及防止其上浮的方法(Method for ensuring the position of reinforcing steel cage in concrete pouring pile and preventing floating)
确保砼灌注桩中钢筋笼的位置及防止其上浮的方法(Method for ensuring the position of reinforcing steel cage in concrete pouring pile and preventing floating)
Abstract: first of all, in the concrete pouring pile, how to ensure the installation of steel cage accurate location, and introduced the control of bored pile reinforcement cage floating method.
Key words: concrete pouring pile; steel cage; location; method
Usually need to pile foundation concrete pile construction in bridge construction, in order to ensure the construction quality of bridge engineering, pile foundation construction in the basic construction was very important, only the pile foundation quality, smooth finish, in order to effectively carry out the next step of the work. In the piling process, to ensure the position of the reinforcement cage in the process of pouring concrete accurately is very important, otherwise the position of the cage offset more, pile reinforcement layer thickness caused by lack of will, resulting in engineering construction quality problems; in addition to prevent the process of pouring concrete pile in the reinforcement cage floating, but also should pay attention to the construction of the problem is to explore and accumulate some experience and methods to process these two aspects in construction of bridge piling, talk about their own views and understanding.
1 ensure the accurate method of installing the cage cage in the concrete filling pile
1.1 accurate positioning of pile foundation and good work of retaining pile
In the pile before construction, positioning first to the positions of pile, the pile position accurately is the precondition and foundation of reinforced cage position accurately, here are related to the location of pile foundation engineering construction in the construction work, not only to identify the location of pile foundation, but also do a good job of protecting pile, in order to prepare location of steel pile foundation construction using period. The general construction
您可能关注的文档
- 眼镜行业(Glasses industry).doc
- 眼镜店营运流程(Operation process of optical shop).doc
- 眼霜选择(Eye cream selection).doc
- 睡前6分钟(6 minutes before going to bed).doc
- 直控终端管理——你如何才能hold住(Direct control terminal management - how can you live in hold).doc
- 睡眠之谜初揭(The mystery of sleep).doc
- 睡眠呼吸障碍与心律失常的临床探讨1(Clinical study of sleep disordered breathing and arrhythmia 1).doc
- 睡袋的选购和保养(Sleeping bag selection and maintenance).doc
- 睡眠10大误区 改变使你变得更年轻(Sleep changes 10 misunderstandings make you younger).doc
- 真诚与碰撞(Sincerity and collision).doc
最近下载
- 《俗世奇人》整本书分享交流教学设计.doc
- 幼儿园-家长抱怨、投诉记录表2.doc
- 2024年中考生物模拟试卷(含答案解析).pdf VIP
- 中心静脉压测量技术(2023年中华护理学会团体标准).pptx
- 塔吊拆除安全专项施工方案(编制、审核要点).docx
- 盐城市规展馆3D影院片制作招标文件(定稿)-招标文件.doc
- 2024年学习教育围绕“六项纪律”(政治纪律、组织纪律、廉洁纪律、群众纪律、工作纪律、生活纪律)研讨交流发言稿【2篇】与“廉洁纪律和群众纪律”研讨发言稿【7篇】汇编.docx VIP
- 水利安全生产知识答题全附完整答案.doc
- 河南郑州“7.20”特大暴雨灾害事件—灾害应对处置.pptx
- 小学五年级下册数学期末考试试卷(含答案).docx VIP
文档评论(0)