- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
暖通施工方案(HVAC construction plan)
暖通施工方案(HVAC construction plan)
This article is contributed by yxl518168
DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view.
order
record
A, two basis, project overview and characteristics of three, construction work and construction organization of four major project construction methods and construction requirements five, to implement plan six, the quality requirements of the project, seven construction safety technical requirements of eight civilized construction nine, ventilation and air conditioning system debugging work for ten construction schedule construction plan figure
HVAC engineering construction plan of scientific research building of CAS Institute of automation
BUCG
I. basis for compilation
1. the project construction design drawings and design requirements of the 2. unit project construction organization design 3. ventilation and air conditioning engineering construction and acceptance specification GB50243-97 construction and installation engineering quality inspection and evaluation standards building equipment installation atlas ventilation and air conditioning engineering (91SB6) installation project item construction technology regulations, Beijing Construction warm health equipment installation quality Several Provisions Beijing construction and installation engineering construction technical data management regulations.
One
HVAC engineering construction plan of scientific research building of CAS Institute of automation
BUCG
Two. General situation of Engineering
Chinese Academy of Sciences Institute of automation research building project is located in Beijing City, Haidian District Zhongguancun Road, a 1, a total construction area of 21514.36m2, basement, ground thirteen, partial fourteen, outdoor floor elevation of -0.45m, 0 is equivalent to the absolute elevation of 51.69m structure for the frame shear wall structure. The construction of concr
您可能关注的文档
- 易车铁刚牌号对比(Yi chetie just grade comparison).doc
- 星巴克知识(Starbucks knowledge).doc
- 星座名称的中日英对照(Chinese, Japanese and British names of constellations).doc
- 星系的哈勃分类(Harbert classification of galaxies).doc
- 星蕴加点法(Star adding method).doc
- 星蕴的作用(The action of star accumulation).doc
- 星际争霸单位语音中英文完全版(StarCraft full version in Chinese and English).doc
- 无纺布种类(Non-woven fabrics).doc
- 春夏交替之际教你五招温补阳气(In the alternation of spring and summer, teach you five ways to warm up Yang Qi).doc
- 春天流行什么病(What's the epidemic in spring).doc
文档评论(0)