某环保工程施工现场管理制度(Construction site management system of an environmental protection project).docVIP
- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
某环保工程施工现场管理制度(Construction site management system of an environmental protection project)
某环保工程施工现场管理制度(Construction site management system of an environmental protection project)
Construction site management system of an environmental protection project
In order to meet the needs of environmental protection market change rapidly, accelerate the development of enterprises, * * * * * * *
Ltd. requires all cadres and employees to have mission like passion, never meet challenges
Spirit, a miracle team spirit, hard work, dedication. Take care of the heavy stuff
The amount in the first place, remember safety first, quality first purpose, to establish a good game
Corporate image, to improve the quality of our construction team, adhere to civilized construction, strengthen the field pipe
Reason, dry a project tree, a monument, talking about collaboration efficiency, to build customers one hundred percent full
Special quality environmental protection project, the following management system is specially formulated.
I. attendance system at construction site
1, the project site staff must be punctual attendance every day. After commencement of works,
Construction work time is 8 hours, or by the site leader in accordance with the construction site technical requirements
Line up working hours.
2, the staff out of the task, the need to ask the person in charge of the scene, allowed to rear
Outgoing.
3 sick leave required to present certificate of sick leave.
4, all staff must comply with overtime due to the progress of the project.
5, absenteeism three times or three consecutive days of expulsion.
Two, construction site regular meeting system
1, from the date of commencement of construction until the completion of the day, insist on holding a meeting every day
Will summarize the day, tomorrow, plan the day after tomorrow construction work, and regularly provide
Detailed work weekly, so that the construction of an orderly manner.
3. Weekly meetings are convened by the project leader, and the existing construction process is performed among the various specialties
Coor
您可能关注的文档
- 末端试水阀作用与功能(Function and function of end water test valve).doc
- 朱莹老师给北大学生出的实验心理学试卷(有答案)(Teacher Zhu Ying gave the experimental psychology papers to Peking University Students).doc
- 机、炉、电、化开停机过程中的工作安排(Work arrangement in the process of machine, furnace, electricity and chemical shutdown).doc
- 朵琳芙秋天使数字401-500含义(Doreen Virtue Angel digital 401-500 meaning).doc
- 机关效能建设的现状与对策(Status quo and Countermeasures of organ Effectiveness Construction).doc
- 机关工作现场会方案(Site meeting programme for government work).doc
- 机床术语(Terminology of machine tools).doc
- 机床行业英汉对照(Chinese and English comparison of machine tool industry).doc
- 机械专业毕业论文题目(Graduation thesis of mechanical major).doc
- 机关单位劳动纪律制度(Labor discipline system in government departments).doc
- 2025年金肯职业技术学院单招职业适应性测试题库带答案.docx
- 2025年钦州幼儿师范高等专科学校单招综合素质考试题库完美版.docx
- 2025年钟山职业技术学院单招职业适应性考试题库参考答案.docx
- 2025年金华职业技术学院单招职业技能测试题库附答案.docx
- 2025年闽南理工学院单招职业技能测试题库审定版.docx
- 2025年闽南理工学院单招综合素质考试题库审定版.docx
- 2025年闽南理工学院单招职业倾向性考试题库汇编.docx
- 2025年闽南理工学院单招职业倾向性考试题库推荐.docx
- 2025年闽北职业技术学院单招综合素质考试题库1套.docx
- 2025年长沙轨道交通职业学院单招职业技能考试题库一套.docx
文档评论(0)