水电安装规范(Code for installation of water and electricity).docVIP

水电安装规范(Code for installation of water and electricity).doc

  1. 1、本文档共14页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水电安装规范(Code for installation of water and electricity)

水电安装规范(Code for installation of water and electricity) Specifications for installation of water and electricity: ?? 1) wiring principle: horizontal and vertical. The use of special financial PVC flame retardant wire pipe, line pipe online slot must be fixed, the wire box and line pipes should be used when the lock nut, every 80 cm using a straight pipe at the corner of every 20 cm using a clamp. 2) in the upper part of the wall socket on the wall, vertical slot, installation line to the top of the wall decoration line in installation angle, if it is lower in the wall, a vertical downward cut to the bottom panels installed above, the groove depth should be the same, the top slot line and straight line control should be activated in the walls. Cutting machine and wall cutting machine, slotting. 3) the use of in the PVC tube, with a spring in the elbow is bent, not using the 90 degree elbow and three (this kind of situation we basically did not appear at this point), the line must support line pipe installation, the adhesive connecting sleeve edge collusion closely. Straight. Smooth. Right angled corner angle should be medial incision, incision in the side tangential arc bending interface after installation. 4) the depth of the pipe is medium, without burr. Pipe joints 5-6 wraps with Teflon tape, pipe cutter teeth number -6 5 tooth teeth until the screw joints, not allowed into the tube in rotten teeth. 5) after the wire is loaded into the casing, the wire fixing tool shall be used. First, it shall be fixed on the wall and inside the wall, then the plastering will be concealed. 6) strictly prohibit the line pipe laying directly under the composite board. (at this point, we are not doing very well at the moment, we will communicate with customers later, and the composite floor must be slotted. In the solid wood floor of the pipe line, there must be reinforcement measures. 7) no line pipe is laid on the kitchen or bathroom floor to prevent water from seeping into the pip

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档