- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水电工程个人工作总结(Individual work summary of hydropower project)
水电工程个人工作总结(Individual work summary of hydropower project)
Individual work summary of hydropower project
Review the work process, I mainly to hydropower professional specifications requirements as the leading, did the following aspects of the work:
I. water supply and drainage works
1. installation of water supply and drainage pipelines and fire pipes.
Before installation of the pipe, the inner and outer walls of the pipe fittings shall be checked for smooth, no cracks, bubbles and layering, and the straight sections of the sunken pipe shall be intact without deformation and breakage, and the injection points of the molding line shall be smooth. When installing, pay attention to the vertical and horizontal parts of the pipe, so that the vertical, vertical and horizontal meet the slope, and the fixed spacing meets the requirements. After the drainage system is installed, the water test is carried out. According to the water distribution point of the water supply system 1/3, the water is released at the same time to check whether the drainage points are unblocked and the interface is free of leakage. The water test according to the piping layout, stratified, partition section water test to start local water from the lower layer, then make the system of water, filled with water in the washing pool, etc. the water basin, and then at the same time, drainage, observation of drainage, with no blocking leakage, smooth drainage is qualified, testing should be good water test record.
2 hydraulic test. Test pressure
Before the hydrostatic test of the piping system, the equipment, meters and piping accessories that are not part of the test shall be isolated. The blind plate shall be marked and recorded. In case of leakage, the pressure test shall not be repaired with pressure. After the defect is removed, the test should be re tested. Clean water is used in hydraulic tests. Air shall be discharged when the system is injected. After the water pressure test of the system is qualif
您可能关注的文档
- 正常运行的两个重要因素及解决方案(Two important factors and solutions for normal operation).doc
- 正宗西安烤面筋,四种口味(Authentic Xi'an roast gluten, four flavors).doc
- 正宗西安烤面筋,四种口味!!!(Authentic Xi'an roast gluten, four flavors!!!).doc
- 正式考试_江门普法网答案(A formal examination _ Jiangmen legal network answer).doc
- 正溴丁烷 的制备 思考题(Preparation of n bromobutane questions).doc
- 正畸工艺4题(4 problems of orthodontic technology).doc
- 正方教务系统成绩录入操作说明(Square educational administration system, score input, operation instruction).doc
- 正畸矫正的几个新技术(Some new techniques for orthodontic treatment).doc
- 正式的全套餐点上菜顺序(Formal full set order serving order).doc
- 正确培养首领尊严的方法! all纲(The correct way to cultivate the dignity of a leader Class all).doc
- 2025年推拿治疗学练习题库精选答案详解.docx
- 2025年推拿治疗学练习题库有答案详解.docx
- 2025年推拿治疗学练习题库带答案详解(能力提升).docx
- 江苏省无锡市选调生考试(行政职业能力测验)综合能力题库含答案.docx
- 2025年推拿治疗学练习题库有完整答案详解.docx
- 江苏省无锡市选调生考试(行政职业能力测验)综合能力测试题带答案.docx
- 江苏省无锡市选调生考试(行政职业能力测验)综合能力测试题带答案.docx
- 江苏省无锡市选调生考试(行政职业能力测验)综合能力测试题必考题.docx
- 江苏省无锡市选调生考试(行政职业能力测验)综合能力测试题推荐.docx
- 2025年推拿治疗学练习题库带答案详解(综合卷).docx
最近下载
- 耕地质量等级+(GBT+33469-2016).docx VIP
- 人教版高中物理必修一课件.pptx VIP
- 新生儿高胆红素血症诊治指南(2025)解读 (1)PPT课件.pptx VIP
- 《新生儿高胆红素血症诊治指南(2025)》解读(1)PPT课件.pptx VIP
- SGT756国电南自保护培训全解.ppt VIP
- 建设工程工程量清单计价办法(市政工程定额章节说明).pdf VIP
- 盘扣模板支撑体系技术交底(二级).docx VIP
- 精创温控器EK-3010说明书用户手册.pdf
- 外墙涂料施工安全技术交底.doc VIP
- 在线网课学习课堂《舰艇操纵与避碰》单元测试考核答案.docx VIP
文档评论(0)