长螺旋钻杆cfg桩施工方案(Construction plan of long spiral drill pipe CFG pile).docVIP

长螺旋钻杆cfg桩施工方案(Construction plan of long spiral drill pipe CFG pile).doc

  1. 1、本文档共14页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
长螺旋钻杆cfg桩施工方案(Construction plan of long spiral drill pipe CFG pile)

长螺旋钻杆cfg桩施工方案(Construction plan of long spiral drill pipe CFG pile) First, CFG pile reinforcement main construction machinery quantity list Serial number of equipment name, specification, model and quantity 1 Yutong drilling machine YTZ26 1 2 excavator PC120 1 3 delivery pump HBTZ60 1 4 loader ZL30 1 5 winch 1 Two, CFG pile construction program 1 、 construction preparation (1) to clear the surface of weeds and so on, so that the site level, in the base of a certain thickness of the cushion layer of gravel soil, in order to ensure the normal construction; (2) before construction, according to the design requirements, the test room shall be used for proportioning test, and the mixture shall be prepared according to the mixing ratio during construction. Long screw bored pile construction slump is 16 ~ 20cm, bored pile pile head laitance thickness not more than 20cm; before construction of pile technology test, to test equipment, process and technical parameters can meet the design requirements. (3) material preparation Cement: the Portland cement with strength grade 32.5 and above shall be adopted. When the cement comes into play, the factory shall have the certificate of ex factory and have the on-site re examination report. Fly ash: the fly ash of grade II or above with fineness not greater than 45% shall be used, and the fly ash shall have factory qualification certificate and on-site re examination report. Stones: the use of solid particles of gravel or gravel 9~16mm, containing mud is not greater than 1%, and should meet the current national standards, ordinary concrete with gravel or pebbles quality standards and inspection methods JGJ53 provisions. Sand: the use of sand or fine sand, mud content is not greater than 3%. Admixture: according to the construction needs, determined by experiment. 2, CFG pile construction process Fig. 1 construction flow chart of CFG pile 3 、 pile location line According to a plan and site pile pile base point, with a laser rangefinde

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档