水电知识004(Hydropower knowledge 004).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水电知识004(Hydropower knowledge 004)

水电知识004(Hydropower knowledge 004) Construction preparation of water improvement for home decoration Or the old saying, quicken, do water reform and perfect solution, is an important condition to ensure smooth construction, while ensuring that the renovation program complete, scientific, safe and reliable. For the owners, the transformation of hydropower before starting with: 1, the design plan of hydropower transformation is mature, and the whole scheme should include accurate positioning point of waterway circuit. 2. signed the contract of hydropower transformation and installation. 3. necessary temporary electricity and water environment. Requirements for construction units: 1. detailed feasible water circuit design drawings 2. temporary construction electricity equipment is safe and reliable 3. other routine preparations are completed Construction procedure of circuit reconstruction The construction personnel control design drawings and construction site owners to determine the position of point to finished product protection to play the line, according to the route according to the elastic line, line box, cleaning slot to muck, tube, wire box fixed to wear, wire connecting various strength wire thread can not be exposed to closed electric vessel, to conduct acceptance testing electric strength Circuit material 1, two home hydropower power lines should be used after the transformation of the national mandatory 3C certification standard BV (PVC insulated single core copper wire); generally do not use jacketed multi conductor cable, such as the emergence of multicore and single core cable joint, necessary for joint rinse tin. 2, electric cable material procurement follow the different uses of separation principle, to prevent the separation caused by maintenance is not convenient, specific performance in: the zero line is blue, yellow line (line), red and green color can be used for grounding wire, yellow green color line. Ensuring the uniform distribution of line c

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档