2011资料员考试试题(2011 examination questions of the data clerk).docVIP

2011资料员考试试题(2011 examination questions of the data clerk).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2011资料员考试试题(2011 examination questions of the data clerk)

2011资料员考试试题(2011 examination questions of the data clerk) 2011 * * * librarians examination questions Source: site original update time: 2011-4-13 hits: 1646 I. judgment questions (20 questions, 2 points each) 1. The engineering data of the computer shall be printed in content and manually signed. (V) 2, in the inspection of decoration, decoration materials, should pay attention to plastering cement testimony, sampling, delivery, test report is complete. (x) 3. The natural granite stone, man-made board and facing artificial board used in the interior decoration of civil engineering works should be witnessed, sampled and submitted. (V) 4, subsection (sub branch) project should be the chief supervision engineer (construction unit project leader) organization design unit and construction unit project leader and technical, quality controller and so on common acceptance sign. (V) 5, inspection batch quality acceptance should be the chief supervision engineer (construction unit project professional technical person), organize the project professional quality inspector acceptance check and sign. (x) 6. The copy of the quality certificate shall be consistent with the original contents, stamped with the original, the official seal of the storage unit, the original storage place, and the signature and time of the handler. (V) 7, when the contractor adopts new technology and new process, the supervision engineer shall review the material proof and material record manual provided by the engineer. (V) 8, the contractor can only carry out the engineering change after receiving the engineering change form signed by the project supervision department. (V) 9, all the drainage pipes shall be ball test, and record (x) 10, the cause of the project shutdown is caused by the construction unit, the construction unit should fill in the project resumption report form, apply for resumption of work. (x) 11, a witness sampling inspection is under the supervision of construction units, by super

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档