变压器容量及其阻抗电压关系(Transformer capacity and its impedance voltage relationship).docVIP

变压器容量及其阻抗电压关系(Transformer capacity and its impedance voltage relationship).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
变压器容量及其阻抗电压关系(Transformer capacity and its impedance voltage relationship)

变压器容量及其阻抗电压关系(Transformer capacity and its impedance voltage relationship) 1 Introduction The rated capacity of transformers and their corresponding impedance voltages are related to the requirements of GB1094.1, GB1094.5 and GB6451, and are mandatory standards. The impedance voltage measured by the transformer manufacturer when the transformer is out of the factory is within the tolerance allowed by the national standard. In most cities in China, the mode of power supply for users is to use 10KV power to the user, and the voltage is 380V (220V) to supply power to the user through the 10KV transformer (transformer). Therefore, the largest number of transformers in each city is the distribution transformer. In a city with the variable load test, the deviation is found among a small part of the transformer impedance voltage value exceeds the permissible range (allowable deviation less than 10% transformer), especially some of the more remote transformer located in small and medium-sized enterprise users. The data analysis found that the impedance measured voltage value most is small, this is not accidental, through further experiment, found that there was discrepancy in actual capacity transformer nameplate rated capacity and transformer, and most of them are one grade. If the nameplate capacity of 400KVA transformer, the actual capacity is 500KVA, the load test, the 400KVA is known as the input of the transformer tester, and the actual capacity is 500KVA, thus causing the measured impedance voltage value is small, if not the load test, it is very difficult to find (with change in handover test is not required to do load test). Most of these enterprise users belong to large industrial users, so it will be directly reflected in the reduction of basic electricity costs, that is, the electricity supply sector to pay less electricity. In view of this situation, according to the corresponding relationship between transformer rated capacity and impedance voltage, at the tes

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档