- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
造价管理单选(Cost management Radio)
造价管理单选(Cost management Radio)
Chapter 1
The first meaning of 1: project cost management is defined from the angle of construction (project investor).
2: according to the first meaning of the project cost, the construction cost refers to the construction (the total investment of the project)
3 different engineering purposes, structure position are very different, which reflects the 4: of individual differences and the project cost in each stage of the whole process of construction projects in the preliminary design decision, technical design, construction drawings, bidding, contract implementation and acceptance stage accordingly the valuation, respectively formed design budgetary estimate, investment estimate revised estimates, the construction drawing budget, contract price, the settlement price and the final price, etc., which reflects that the project cost (multiple) valuation characteristics.
5: the actual cost of the project is in the (completion acceptance) stage determined.
6: budget cost is in the (construction drawing design) stage.
7: budget estimate cost refers to in the preliminary design stage, according to the design intention, through the preparation of project budget documents, preliminary calculation and determination of the project cost is mainly subject to (investment estimate) control
8: the two kinds of management of project cost refer to the management of investment cost and the management of project price
9: the following about the content of the reform of engineering cost management is not correct (the implementation of each stage of the project cost, independent management)
10: the ultimate goal of the reform of our countrys construction cost management system is to establish a price mechanism based on market formation
11: cost engineer qualification, is to fulfill the project cost management responsibilities and business (access qualification)
12: does not belong to the project cost engineer right is (to determine the charging standards)
13
您可能关注的文档
- 一个常人无法感受到的交易者心路历程.doc
- 一二·九运动的伟大意义(The great significance of the December 9th Movement).doc
- 一二线蓝筹及指标股(Second tier blue chip and index stocks).doc
- 一些奇怪一点的文字(Some strange words).doc
- 一个10年老期货谈交易系统(A 10 year old futures trading system).doc
- 一些开心的句子(Some happy sentences).doc
- 一个前富士康员工眼中的致命细节 - 人力资源 - 世界经理人网站(The fatal details of a former Foxconn employee - Human Resources - World managers' Web site).doc
- 一些很好的句子(Some very good sentences).doc
- 一些练习文本文档(Some exercise text documentation).doc
- 一些超级搞笑的句子(Some super funny sentences).doc
- 逻辑数学智力题(Logical mathematical intelligence).doc
- 逻辑学(logic).doc
- 道德与法律的关系(The relationship between morality and law).doc
- 造价员考试(Cost Clerk examination).doc
- 造价工程师的特点(Characteristics of cost engineer).doc
- 造型师钟毅(Stylist Zhong Yi).doc
- 道路桥梁测量中常用仪器(Common instruments in road and Bridge Survey).doc
- 避免论文不小心抄袭的经验(Avoid the experience of careless copying).doc
- 那催人奋斗的一句话(A hurried word).doc
- 那个跨国企业都看好的地方(The place where multinational companies are good).doc
文档评论(0)