造价员考试(Cost Clerk examination).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
造价员考试(Cost Clerk examination)

造价员考试(Cost Clerk examination) Examination questions on network continuing education examination for cost employees in 2011 (Tu Jian) Tip: length of examination (50 minutes) remaining time (0 hours, 43 minutes, 10 seconds): please do not close the window and refresh the page during the exam! (the system automatically saves the answer every 10 minutes) Radio question (40), 1 points for each question, 40 points (1) about the stair skirting line, the following statement is correct. A: developed area according to execution block side panel according to the corresponding quota project implementation project B: C: by the corresponding quota project multiplied by the coefficient 1.15 D:, according to the corresponding quota project, multiplied by factor 1.15 (2) the vertical transportation of decoration and decoration shall be calculated according to (). A: according to the unit construction area B:, according to the unit labor cost The C: difference between different height (vertical transportation department building eaves height) according to the quota work were calculated for D: different vertical transportation height (single storey building department eaves height with artificial and mechanical fee) fee and Yuan were calculated according to the (3) the calculation rules for the quantities of the floor leveling floor of the building; the following statement is incorrect. A: calculated by the clearance area between the main walls, B: deducts the area occupied by the projecting structures, equipment foundations, indoor pipes, trenches and so on C: and 0.3m2 do not deduct within the partition wall column, wall, wall attached chimney and hole area D: door, empty ring, heating bag slot, the opening into the recesses of the engineering quantity (4) floor leveling layer is calculated according to (). A: the main floor area between the main wall B:, the main wall clearance area C: horizontal projection area, D:, paved area (5) the linear marble skirting line is calculated acco

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档