- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
645规约术语(645 protocol terminology)
645规约术语(645 protocol terminology)
2009-11-29 20:49
Glossary of terms commonly used in function tables
1. year timezone
A time zone where an electric meter can function at most. If the number of time zones less than programmed years time, electric energy meter is running only in front of several time zones (the first 2 time zone is running as the time zone number is 2.). When the number of time zones is numbered 0, the meter runs only the first time zone (no matter how many time zones are programmed). The maximum number of time zones in 2012 is not more than 4.
Table number of 2. day period
The daily period number of the meter that can operate at most. If the day table number is set to 3, fourth and fifth meter day table is invalid, even if a time zones Day table number is set to 4, the time zone will run according to the third day table time, and not according to the fourth day table operation period. If the daily schedule is numbered 0, the meter runs only first days. Maximum daily table count not exceeding 5.
3. day periods
The daily hours that an electric meter can run at most. Maximum not more than 10. If the number of day periods is set to 4, the time meter of the fifth to 10 periods of each day table will be considered invalid and only valid for the first 4 periods. If set to 0, the meter runs only for the first day.
4. day time table number
When programming, it is used to indicate that the meter is running in the first few days, and the time table is expressed by 1, 2, 3, 4 and 5. If the time zone table number of the time zone is set to 0, the meter is fixed as a first day time table.
5. rate
The electric energy meter can switch rate number. Its maximum value is not more than 4. If the rate is set to 3, then only T1, T2, and T3 are valid, and the T4 defaults to T3 rates. If the rate is set to 2, then only T1 and T2 are valid, and T3 and T4 will be default to T2 rates, and so on. At 0, the meter runs only 1 on any day.
6. rate number
Programming is used to ind
您可能关注的文档
- (转)什么是西南大旱的最坏准备_月是故乡明_新浪博客((trans) what's the worst preparation for a drought in Southwest China _ is home next month _ Sina blog).doc
- (人教版)八年级下册语文课后生字词拼音及解释(完整版)((PEP) grade eight Chinese Pinyin words epigenetic and interpretation (full version)).doc
- 0-90度正弦值(0-90 degree sine).doc
- - 上海lng加气站 上海cng加气站博客上海lng加气站 上海cng加气站博客(- Shanghai LNG filling station, Shanghai CNG filling station blog, Shanghai LNG filling station, Shanghai CNG filling station blog).doc
- 010年顺义区中考二模数学试题(010 years of Shunyi District senior high school entrance examination mathematics examination the second mock exam).doc
- (设计)工作细则 - 上海工程技术大学 继续教育学院((Design) working rules - Continuing Education College of Shanghai University of Engineering Science).doc
- 02-03第一学期初三语文试卷52898(02-03 Chinese exam paper for the first semester 52898).doc
- 020我国基层群众自治制度地位的重大提升(020, the important promotion of our country's grass-roots mass autonomy system).doc
- 05-2-1.汉王降价,能降出个怎样的未来(05-2-1. Hanvon prices can drop out of what the future).doc
- 05.无形资产(5 intangible assets).doc
- 2024年化工技能鉴定自我提分评估附答案详解AB卷.docx
- 2024年化工技能鉴定自我提分评估附答案详解AB卷.docx
- 2024年化工技能鉴定自我提分评估附参考答案详解【达标题】.docx
- 2025年制造业质量管理体系优化策略及案例解析.docx
- 2025年城市地下综合管廊智慧运维系统在城市环境监测中的应用实践.docx
- 2024年化工技能鉴定自我提分评估附参考答案详解【实用】.docx
- 2024年化工技能鉴定自我提分评估新版附答案详解.docx
- 2025年城市地下综合管廊智慧运维系统在智慧旅游中的应用.docx
- 2024年化工技能鉴定自我提分评估必考题附答案详解.docx
- 2024年化工技能鉴定自我提分评估精华版附答案详解.docx
文档评论(0)