变电题库(Transformer bank).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
变电题库(Transformer bank)

变电题库(Transformer bank) Fill in the blanks 1, substation equipment patrol inspection, generally divided into (normal inspection (including handover classes, visits)) (comprehensive inspection) (special inspection) 2, standby or stand-by equipment shall be as regular as the running equipment (Patrol) and (maintenance). 3, set control stations on duty duty personnel should be in time to check the substation under the upload information, every two hours to all the substation (picture), (report), (upload information) comprehensive inspection. 4, storage battery should check (voltage), (temperature) meet the requirements, whether the joint connection is fastened, whether there is fever, oxidation, the battery container has no (broken), (leakage). 5, substation comprehensive automatic machine inspection items: should visit the main wiring diagram and (actual equipment) position consistent, remote measurement is correct. We should visit the alarm window, event sequence record, (protection event record), remote change record, and (over limit alarm signal) to check whether there is any abnormal signal. 6, emergency cases, oil immersed, self cooled and air-cooled transformers allow short-term overload operation, environmental temperature at 20 degrees and below, allowing overload (30%), the ambient temperature of 30 degrees, allowing overload (15%). But the overload running time is not more than (24) hours. 7, voltage ratio and different impedance voltage of transformer in any one will not overload situation, can run in parallel, but the voltage difference should not be more than (1%), impedance voltage difference should not exceed (10%), capacity ratio should not exceed (1/3), transformer connection to different groups of non parallel operation, different transformer impedance voltage should be increased two times the voltage transformer impedance voltage of transformer capacity, so that can make full use of. 8. The voltage regulating operation of on load voltage regulating d

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档