市政实务复习题(Review of municipal practice).doc

市政实务复习题(Review of municipal practice).doc

  1. 1、本文档共18页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
市政实务复习题(Review of municipal practice)

市政实务复习题(Review of municipal practice) [municipal practice] complete version 2013 1., a roadbed +C miserable quicklime 2. +C 7 at room temperature 3. in the absence of clayey groundwater +D 4. cement concrete +B fall 5 about static +D pile driving process 6. about plate beam +B adoption 7. project department +D10 8. about +C reverse slope excavation 9 drain pipe +D 1-3-5-4-6-2-8-7 10. flexible drain pipe +D medium sand 11. about pretensioned, +C, take both 12. the following support +A cast-in-place 13., shallow buried excavation, +D method In 2013 two construction division of municipal public project management and practice Zhenti and analysis A single choice (a total of 20 questions, 1 points for each question, options for each question, only 1 of the most to do) 1., when a roadbed is compacted, the spring is produced, and the proper treatment measures are (). A. increase the power of compactor B. sprinkle the right amount C. is compacted with lime and then compacted D. reduces roller rolling speed [answer] C [analytic] this is the foundation reinforcement method. The spring appears in the subgrade, mainly because the water content of the material is too large. At this time, cement, lime or mortar should be added to reinforce the foundation so as to improve the bearing capacity of the foundation. See textbook P9. 2. at normal temperature, the curing time of cement stabilized soil base should be at least () days. A.5 B.6 C.7 D.8 [answer] C [analytic] this article examines the different grass-roots construction technical requirements. The cement stabilized soil base must be kept moist and maintained, and it should be protected by 7d at room temperature before it is dry and wet. See textbook P12. 3. 4.5m deep foundation pit is excavated in homogeneous soil without groundwater. If there is no load on the top of the pit, the slope of the pit wall should be no more than 1:1. A. sand soil B. gravelly soil C. silty sand D. clay [answer] A [analysis] the subject of this stud

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档