- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
墙面装饰施工(Wall decoration construction)
墙面装饰施工(Wall decoration construction)
Technology process of covering wall decoration
1. wood paneling, wood paneling
Structure of wood paneling, wood dado. The wall is buried in anticorrosive wood bricks, will wooden frame is fixed on the block, and then the panel nail glued or skeleton crib. Wooden keel section is 20~40 mm * 40~50 mm, wooden keel spacing is 400~600 mm.
2. wood paneling, wood dado construction process:
To play the line, making wall, wooden frame, wooden frame fixed installation woodveneer, closing line installation
3. construction points
(1) metope requirement is smooth. If the wall surface is smooth, the error is within 10 millimeters, and the plastering method can be adopted; if the error is more than 10 millimeters, the wood block between the wall and the keel can be added.
(2) according to the panel height and the size of the room by bone nail sticks, whole or split installation, installation skirting board in wooden dado skirting board is fixed on the bottom of the mat and wooden wallboard, skirting board height 150 mm, with wood strips fixed on the clapboard on the rail.
(3) to determine the size of wooden keel according to the thickness of the panel, the transverse keel generally in about 400 mm, 600 mm in the vertical keel. When the panel thickness is more than 1 millimeters, the horizontal keel spacing can be enlarged appropriately.
(4) peg, the top panel to cable leveling, wood strip size should be consistent.
(5) wooden dado after installation, should be immediately finishes, brushing oil again, to prevent other types of surface pollution.
4. matters needing attention
Wet walls should be dry after construction, or moisture-proof treatment. One can do moistureproof layer on the wall; the two is to vent in the upper and lower left panels; three is through the wall brick overhangs, the panel, the wooden keel and a certain distance from the wall, avoid the influence of moisture on the panel.
Two walls of yin and Yang corner, you must add naile
您可能关注的文档
- 信息处工作总结(Job summary of Information Office).doc
- 侃侃的歌词(Look at the lyrics).doc
- 信息工作在营销活动中的地位(Position of information work in marketing activities).doc
- 信息技术学科教研组教研工作计划2009——2010学年度第一学期(Information technology discipline teaching and research group work plan 2009 - 2010 academic year of the first semester).doc
- 信息标识系统的设计原则(Design principles of information identification systems).doc
- 信息系统项目监理-提高投资效益的重要手段(Information system project supervision - an important means to improve investment efficiency).doc
- 信息网络传播权概念及相关原则浅解(The concept of information network communication right and its relative principles).doc
- 信用与利率机制(Credit and interest rate mechanism).doc
- 信用社(Credit cooperative).doc
- 保险学重点案例及分析2(Key cases and analysis of insurance 2).doc
最近下载
- 学校教学楼采暖改造投标方案施工组织设计.doc VIP
- 能源转型关键矿产的“资源民族主义”抬头趋势——基于2023–2025年印尼、智利、墨西哥出口管制.docx VIP
- 养老院入院协议合同协议表格模板实用文档-养老院入院协议百.pdf VIP
- 湘少版三年级英语上册全册教案.pdf VIP
- T-CIAS-3-2020建筑设备安装工程支吊架计算书编制标准.pdf VIP
- 加味左金丸治疗肝胃不和型反流性食管炎临床观察.pptx VIP
- 新苏教版二年级下册道德与法治期末测试.docx VIP
- 地下管网cctv检测报告.docx VIP
- (高清版)DB12∕T 1115-2021 泵站工程运行管理规程.pdf VIP
- ZP型矿用自动洒水降尘装置说明书.doc VIP
原创力文档


文档评论(0)