接地与接零保护系统(Earthing and earthing protection system).docVIP

接地与接零保护系统(Earthing and earthing protection system).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
接地与接零保护系统(Earthing and earthing protection system)

接地与接零保护系统(Earthing and earthing protection system) Ground and ground zero protection system.Txt This article is contributed by lengmianbing DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. Grounding protection system 1, without using the TN-S system, the temporary power system is directly grounded three-phase four wire power system deducted 10 points in our countrys construction site, grounding system, the zero connection protection system has two forms: TT system and TN system, TN the system is divided into TN-C system, TN-S system and TN-C-S system. (1) the TT system of TT system refers to the protective system which directly connects the electric equipment to the normal metal shell or frame directly in the power system which is grounded directly at the neutral point of the power supply. The distribution box construction site operation requires large amounts of electric machinery and electric tools for power supply and distribution device, switch box, if the electrical equipment normally uncharged metal shell and the base are for the protection of ground, not only need a large number of steel buried underground, one-time use, and grounding device fabrication, buried amount is great, it is not possible to achieve the one hundred percent grounding requirements, especially for some mobile electrical equipment, such as mobile electric electric equipment, mobile distribution box, switch box, lighting box, protective earthing device is difficult to achieve, and the work of the zero line to ground potential by electrical equipment line touch the effect of the short circuiting shell is also a negative factor. Therefore, for the construction of temporary power projects, the use of TT grounding protection system, from an economic, technical point of view, are inappropriate. The TT system stands for symbolic meaning: T: (first letter) represents a direct grounding of the po

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档