The thirteenth chapter, ground engineering
1, construction ground construction quality acceptance specification - GB50209 - 2002 7 mandatory provisions
2. Construction requirements and water storage test of ground with waterproof requirements;
3. Requirements for re examination of materials.
First, individual choice questions
1, the current construction ground construction quality acceptance specification code name is (B).
A, GB50209-95, B, GB50209-2002, C, GB50037-2001
2, the construction process technical standards can be developed by the enterprise itself, the current national (B) technical standards.
A, B, not yet
3, indoor adhesives should be in line with the design requirements, but also in line with (B) requirements.
A, GB50209, B, GB50325, C, GB50300
4, the base soil should be even and dense, the compaction coefficient should meet the design requirements, and when the design is not required, it should not be less than (A).
A, 0.90 B, 0.95 C, 0.85
5, sand and gravel cushion thickness shall not be less than (C) mm.
A, 80100, B, 80, 90, C, 60100
6, gravel cushion stone in the maximum particle size shall not be greater than the thickness of the cushion (A).
A, 2/3, B, 3/4, C, 1/3
7, the rubble cushion and gravel cushion thickness should not be less than 100, the broken particle size should not be greater than (B).
A, 50 B, 60 C, 70
8, the thickness of the cushion on the concrete shall not be less than (A) mm.
A, 60 B, 80 C, 70
9, when the internal irradiation index (IRa) is greater than 1 or the external exposure index (Ir) is greater than 1.3, the engineering site soil (A) is used as the reclamation of the project.
A, not B, can only C, after processing can
10, the compacting factor of backfill shall be determined by (B).
A, design, B, test
11, there are waterproof requirements
您可能关注的文档
- 房地产开发与资产评估(Real estate development and asset evaluation).doc
- 房地产成本管理【大连】中海地产成本管理36个关键时刻实战研讨会(7月26-27日 )(Real estate cost management [Dalian] real estate cost management in 36 critical moment actual combat Seminar (July 26-27)).doc
- 房地产的23条通俗黄金定律(23 popular golden laws of real estate).doc
- 房地产经纪相关知识精讲班第19讲讲义(Real estate brokerage related knowledge, fine lectures, lectures, lectures nineteenth).doc
- 房屋的增层改造技术(Storey adding and rebuilding technology of building).doc
- 房地产开发项目风险识别分析(Real estate development project risk identification analysis).doc
- 房企的品牌鸡肋(Housing prices brand tasteless).doc
- 手工创建数据库(Create database manually).doc
- 手工清除方法(Manual removal method).doc
- 手工电弧焊的工艺要求(Process requirements for manual arc welding).doc
原创力文档

文档评论(0)