江苏省建设工程质量检查员岗位培训参考资料考试电子小抄第十三章 地面工程(Jiangsu Provincial Construction Engineering Quality Inspector training reference electronic examination chapter thirteenth ground engineering notes).docVIP

  • 3
  • 0
  • 约 14页
  • 2017-10-06 发布于河南
  • 举报

江苏省建设工程质量检查员岗位培训参考资料考试电子小抄第十三章 地面工程(Jiangsu Provincial Construction Engineering Quality Inspector training reference electronic examination chapter thirteenth ground engineering notes).doc

江苏省建设工程质量检查员岗位培训参考资料考试电子小抄第十三章 地面工程(Jiangsu Provincial Construction Engineering Quality Inspector training reference electronic examination chapter thirteenth ground engineering notes)

江苏省建设工程质量检查员岗位培训参考资料考试电子小抄第十三章 地面工程(Jiangsu Provincial Construction Engineering Quality Inspector training reference electronic examination chapter thirteenth ground engineering notes) The thirteenth chapter, ground engineering 1, construction ground construction quality acceptance specification - GB50209 - 2002 7 mandatory provisions 2. Construction requirements and water storage test of ground with waterproof requirements; 3. Requirements for re examination of materials. First, individual choice questions 1, the current construction ground construction quality acceptance specification code name is (B). A, GB50209-95, B, GB50209-2002, C, GB50037-2001 2, the construction process technical standards can be developed by the enterprise itself, the current national (B) technical standards. A, B, not yet 3, indoor adhesives should be in line with the design requirements, but also in line with (B) requirements. A, GB50209, B, GB50325, C, GB50300 4, the base soil should be even and dense, the compaction coefficient should meet the design requirements, and when the design is not required, it should not be less than (A). A, 0.90 B, 0.95 C, 0.85 5, sand and gravel cushion thickness shall not be less than (C) mm. A, 80100, B, 80, 90, C, 60100 6, gravel cushion stone in the maximum particle size shall not be greater than the thickness of the cushion (A). A, 2/3, B, 3/4, C, 1/3 7, the rubble cushion and gravel cushion thickness should not be less than 100, the broken particle size should not be greater than (B). A, 50 B, 60 C, 70 8, the thickness of the cushion on the concrete shall not be less than (A) mm. A, 60 B, 80 C, 70 9, when the internal irradiation index (IRa) is greater than 1 or the external exposure index (Ir) is greater than 1.3, the engineering site soil (A) is used as the reclamation of the project. A, not B, can only C, after processing can 10, the compacting factor of backfill shall be determined by (B). A, design, B, test 11, there are waterproof requirements

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档