监理工程师继续教育市政试题1(The supervising engineer continued to teach the municipal examination questions 1).docVIP

  • 1
  • 0
  • 约1.61万字
  • 约 25页
  • 2017-10-06 发布于河南
  • 举报

监理工程师继续教育市政试题1(The supervising engineer continued to teach the municipal examination questions 1).doc

监理工程师继续教育市政试题1(The supervising engineer continued to teach the municipal examination questions 1)

监理工程师继续教育市政试题1(The supervising engineer continued to teach the municipal examination questions 1) Supervision engineer to continue education questions 1 First questions (2 points) Bored pile construction shall be carried out before the embedment of the retaining tube A. measurement positioning B. drilling C. dipping steel cage D. concreting Second questions (2 points) In the construction method of underground station, the most widely used and mature technology at home is () A. open cut method B. cover and dig method C. hidden excavation method D. top-down excavation method Third questions (2 points) Selection of cement for interval shotcrete lining under concealed excavation method A. slag cement B. ordinary portland cement C. Portland cement D. volcanic ash cement Fourth questions (2 points) Landfill sites are strictly prohibited to be mixed with the following items. A. hazardous wastes and radioactive wastes B. organic waste C. rotten waste Fifth questions (2 points) Ball tanks must be equipped with () more than one safety valve and emergency vent valve during atmospheric test. A.1 B.2 C.3 Sixth questions (2 points) During the period when the ground wall is in groove, the supervisor shall check the number of slurry on each trough section no less than (twice) A. B. two C. three D. four Seventh questions (2 points) Personnel engaged in nondestructive testing of spherical tanks must hold (or) the corresponding qualification certificates for nondestructive testing personnel for boilers and pressure vessels. A. Technical Supervision Department B. Labor Department C. safety supervision department Eighth questions (2 points) The concrete pouring in the ground wall shall not be interrupted for more than (minutes) A.15 B.20 C.25 D.30 Ninth questions (2 points) After the guide wall is symmetrically poured, the formwork can be removed after the strength reaches () A.60% B.70 C.80% D.90% Tenth questions (2 points) The methane gas content above the landfill site must be less t

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档