瞿弦和到木矿走访慰问(Qu string and to the mine to visit condolences).docVIP

  • 0
  • 0
  • 约1.47万字
  • 约 11页
  • 2017-10-06 发布于河南
  • 举报

瞿弦和到木矿走访慰问(Qu string and to the mine to visit condolences).doc

瞿弦和到木矿走访慰问(Qu string and to the mine to visit condolences)

瞿弦和到木矿走访慰问(Qu string and to the mine to visit condolences) Qu string and to the mine to visit condolences Washington correspondent Liu Tong Qu Xianhe in November 21st, Chinese coal mine in the head of the troupe of Beijing Coal Group Chairman Cao Wen Jun accompanied by Haohua energy company Muchengjian coal mine visit. Qu Xianhe visited the mine education and training base, understood the use of various simulation teaching equipment, and discussed how to better carry out education and training work with the relevant person in charge of the mine. Is the downhole condition difficult? What about the living conditions in the mines? How much revenue has increased this year? During the string to Taiwan and Qu wells are cultural square full-time training staff and rescue center players condolences, and will be a safe production of promotional materials delivered to the hands of the staff, told everyone to comply with the rules and regulations, keep in mind the family looking forward to read, really do not violate the chapter. Qu chord and conversation with employees, Liu Tong photography Master Fengs challenge Correspondent Lin Xiaona External unit installation monitoring system to 700 thousand yuan, he is in charge of installation only need 300 thousand yuan, how can save so much money? Its amazing. What the hell is going on here? Investigate its reason, from June this year. At that time, Beijing coal chemical Hebei Taihang reservoir area built a new warehouse, compared with the original reservoir built in 90s of the last century, three warehouses are very old, security measures are also very backward. In accordance with the relevant standards of the state industry, it is necessary to carry out comprehensive technical renovation of the video surveillance and security system in the reservoir area. It is understood that the installation of a complete set of monitoring system equipment needs about 700000 yuan. 700 thousand, this huge figure, beyond the beginning of the fina

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档