海上风电出运码头工程总体设计-中国港湾建设.PDFVIP

  • 93
  • 0
  • 约 5页
  • 2018-11-27 发布于天津
  • 举报

海上风电出运码头工程总体设计-中国港湾建设.PDF

海上风电出运码头工程总体设计-中国港湾建设

36 卷 5 期 国港湾建设 Vol. 36 No.5 2016 年5 月 China Harbour Engineering May. 2016 海上风电出运码头工程总体设计 戴志峰,韦海琳,徐戎 (中交 三航务工程局有限公司宁波分公司,浙江 宁波 315200 ) 要:风电基地需实现陆域场地拼装、出运风机部件和码头前沿吊装风机整机这一整套复杂工艺流程,拼装工艺 和码头平面的选择布置是工程设计的关键点。通过合理布置海上风电出运码头平面,选择适宜当地条件的拼装工艺, 有效提升了拼装工效,为风电场的按期投运提供保障。 关键词:海上风电;拼装出运工艺;码头平面 中图分类号:U656.1 ;U652.7 文献标志码:A 文章编号:2095-7874(2016 )05-0039-05 doi :10.7640/zggwj s201605010 Overall design of a wharf for shipment of offshore wind turbine DAI Zhi-feng, WEI Hai-lin, XU Rong (Ningbo Branch of CCCC Third Harbor Engineering Co., Ltd., Ningbo, Zheji ang 315200, China ) Abstract A wind power base needs to implement a set of complex process including land site assembly, shipment of turbine components and lifting the whole turbine alongside a wharf, and the assembling process and the layout of the wharf are the key points in the engineering design. A rational layout plan of the wharf for the shipment of offshore wind turbine and an assembling process suitable for the local conditions can enhance the assembly efficiency, and provide a guarantee for the wind farm to be put into operation on time. Key words offshore wind power; assembling and shipment process; overall design of wharf 根据国家发展改革委员会《可再生能源中长期 1 工程概况 》, , 为满足东海风电二期、临港海上风场的工程 发展规划 到2020 年 将力争使可再生能源发 , 需要,推进海上风电场建设,占领江浙沪周边海 电装机在总装机容量的比例达到30 %以上 其中 风电达到3 万 MW。目前最新的能源政策是加快 上风电市场,中交三航局在浙江舟山建设海上风 , 机安装综合基地。 风电等清洁高效能源的建设 预计2020 年风电总 装机将达到10 万 12 万MW。将重点建设六省区 1.1 项目选址 , 、新疆、 项目场址在浙江省舟山市岱山本岛西南临港 七大千万级风电基地 包括甘肃、内蒙古 吉林

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档