- 39
- 0
- 约3.02千字
- 约 6页
- 2017-11-08 发布于福建
- 举报
探究弱电工程项目成本管理和控制
探究弱电工程项目成本管理和控制 【摘要】成本管理是一项系统性很强的工作,它贯穿于项目自立项阶段直到竣工验收阶段的全过程,本文结合弱电工程特点,通过分析项目各个阶段的主要工作,提出各阶段的成本管理与控制要点。
【关键词】弱电工程项目管理成本管理与控制
【 abstract 】 cost management is a systematic work, it throughout the project stand on its own stage until the whole process of the completion acceptance stage, in this paper, combining with the characteristics of weak current engineering, through the analysis of the main work of projects at various stages, each stage of cost management and control key points are put forward.
【 key words 】 weak current engineering project cost management and control
中图分类号: F
原创力文档

文档评论(0)