- 1、本文档共25页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
5、QSB风险降低
* BE BRIEF Use the balloons and stay brief 按各气球,简单讲解 * PFMEA Shalls are NOT all inclusive these are the examples to stress PFMEA 的“必须”项目仅举例强调,没有全部包括。 译者: 原文“8.3”系错误,改为“8.2”。 An FMEA is developed by a multi-functional (or cross-functional) team. The team size will depend both on the complexity of the design and the size and organization of the company. Team members need relevant expertise, available time and authority sanctioned by management. (FMEA, 4th Edition, Page 4, “Chapter I General FMEA Guidelines, Impact on Organization and Management”) 译者: * “Tier 2 changes” 翻成“二级供应商的有关变更”。意在强调此处不是改变供应商。 * 翻译:“新产品、工装移地或供应商变更。”,原文“Product from an acquisition, tool move or change in supplier.”,翻译意在表达“PFMEA’s do not exist for a manufacturing process” (refer to GQP-012 “Risk Reduction”, rev Apr 24, 2006, section 5.3.1)。 * 翻译:“久未修订的 PFMEA。”,原文 “PFMEA with oldest revision dates.”,非指 AIAG FMEA 手册版本。 译者: * 翻译:“质量门”,原文:“Quality Gate”,建议理解为Verification Station。 译者: GP-8 (第 4.2 节):(Rev: May 15, 2005) 4.2 RPN Reduction Process - Suppliers are required to have a formal and documented RPN reduction process which includes: ? A cross functional team that meets regularly and updates FMEA and Control Plans ? Collection of external and internal data relative to rejects (scrap and rework) ? Incorporation of internal data (FTQ, scrap, etc.) and external data (PRR, etc.) into the FMEA and validation that assigned RPN numbers are reasonable and accurate ? A defined strategy for ongoing efforts for RPN reduction ? Identification and implementation of action plans with timing and accountability * Suppliers shall develop an action plan to reduce risk using RPN reduction strategies. If it is a small supplier with a simple process and no quality issues, the list might be a top 5. If the supplier has multiple lines with complex process and parts; the list must be longer.. If the supplier is in Top Focus, Controlled Shipping, or is in Launch, the list may be longer. The number of RPN must be consis
您可能关注的文档
最近下载
- 《包装工程》投稿写作模板 模板使用说明: 1. 请将稿件直接 ....doc
- 百胜包装品工厂质量体系审核纲要及评估细则 V2012.pdf VIP
- 个人信用报告征信详细版纸质版2024年2月最新版带水印可编辑-实线.pdf
- 第三十届WMO省测特训营6年级第二讲——寻找透明的积木.docx VIP
- 第三十届WMO省测特训营6年级第二讲——课后练习题含答案.docx VIP
- 第三十届WMO省测特训营6年级第一讲——课后练习题含答案.pdf VIP
- PBL病例—休克【24页】(最新文档).pptx VIP
- 故事——小羊过桥.ppt
- 征信简版电子版PDF个人信用报告最新版2024年可编辑带水印模板.pdf
- 食品用包材供应商现场审核方案(检查表).xls VIP
文档评论(0)