- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Nuclear Industry QA Initiatives and Opportunities核工业质量保证措施和机会
Nuclear Industry QA Initiatives and Opportunities ASQ Southern Jersey Section October 22, 2008 Dinner Meeting Tom Mudge URS Washington Division Topics of Discussion Nuclear Industry Background 1978 - Today Today’s Nuclear Industry Challenges Industry QA Initiatives Company Opportunities QA Professional Opportunities Nuclear Industry 1978 -2004 126 Nuclear Plants under Construction (2 Step Licensing Process) Environmental Group Protests 1979 - Three Mile Island Incident Loss of Public Confidence Changing NRC Licensing Requirements Cost Overruns 1986 - Chernobyl Incident 1992 - Shoreham (built for a cost of $5.5 Billion) is sold for $1.00. Plant was fully decommissioned in 1994 never having operated. No new plants ordered after 1980 and several under construction were cancelled. Nuclear Industry -2004 104 operating plants in USA No new nuclear plants had been ordered in past 20 years. Industry workforce was aging and predominantly Operations based. Limited number of nuclear experienced personnel in the design and construction Insufficient number of qualified suppliers Drivers for Industry Renaissance Need for reliable economical energy source Environmental concerns for Global warming Change in Public’s perception of nuclear plants Reliable performance of existing plants Energy Act of 2005 Loan guarantees Incentives for first six plants to be built 10CFR Part 52 (One step licensing process) Standardized plant designs 10CFR Part 52 One step licensing Process Standard Design Certification (DCD) Combined Operating License (COLA) Early Site Permits (ESP) Inspection, Test and Analysis and Acceptance Criteria (ITAAC) Standard Plant Designs ABWR (Advanced Boiling Water Reactor) by GEH Toshiba AP-1000 (Advanced PWR) by Westinghouse ESBWR (Economically Safe Boiling Water Reactor) by GEH EPR (European Pressurized Water Reactor) by Areva US APWR (Advanced Pressurized Water Reactor for US Deployment) by Mitsubishi Heavy Industries Consortiums ABWR - Toshiba Fluor A
您可能关注的文档
- 2018新人教版八年级英语上册重点句型Unit4What.ppt
- 21世纪高级营销主管培训:设计和管理服务(PPT 13).ppt
- 2017秋七年级数学上册 2.1 用字母表示数课件1 (新版)湘教版.ppt
- 21世纪高级营销主管培训--第十六章-选择和治理营销渠道(PPT 15).ppt
- 2018新版施工现场临时用电安全技术规范.ppt
- 21世纪高级营销主管培训:通过质量服务和价值建立顾客满意(ppt 14).ppt
- 2精品课件人教版小学数学四年级上册第一单元《大数的.ppt
- 24520738计算机组成原理PPT电子课件教案-第1章 计算机系统概论.ppt
- 3S方案资料(完整版).ppt
- 3903994322猜词游戏词语大全.ppt
- 分析let s单元56ago2卷纸zheng unit56.pdf
- 塑胶材料其它分类原料pa9t 12.pdf
- md16x16数字媒体切换器设备.pdf
- 者参考项目发起人学科类型单位序列承包商修订页代码顺序典型.pdf
- 届世界天然气大会阿姆斯特丹2006add10288.pdf
- 期测试记录表每周weekly g1g6 journeys tests level 6 lesson26.pdf
- modernize-whitepaper现代化您应用程序白皮书.pdf
- anybackup产品典型案例分析.pdf
- 约克金融工程课程tfeslide32.pdf
- 广州市妇女儿童医疗中心历份教学药历01tjy.pdf
文档评论(0)