- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
PS-PLATING译文
DAIMLERCHRYSLER CORPORATION NO: PS-PLATING
Process Standard Date Published: 2003-12-10
Category Code: H-1 Change: Z
EASL Req. Yes
Restricted: No
***ZINC- MECHANICAL AND ELECTROPLATED***
机械镀锌与电镀锌
1.0 GENERAL 总则
1.1 Purpose of the Standard*** 本标准的目的***
This standard outlines the procedures and requirements for electroplated zinc, and mechanically plated zinc coatings on iron and steel parts for corrosion protection.
本标准概述了有关钢铁零件的防腐蚀的电镀锌和机械镀锌涂层的工艺规程和要求。
1.2 Purpose of the Process*** 过程的用途***
This standard provides the procedures and requirements for producing electroplated zinc deposits. Parts with a hardness of HRC 32 or higher MUST be electroplated according to PS-4220 which requires a mandatory bake operation to relieve hydrogen embrittlement. PS-4220 is identical to PS-79 respectively, except for the mandatory bake. This standard also covers the requirements for mechanically plated zinc deposits. The following Process Standards, which were formerly all individual standards and are still referenced on drawings as such, are covered by this one standard:
本标准对生产电镀锌层提供了工艺规程和要求。硬度达到或大于 HRC32 的零件的电镀“必须”按照 PS-4220,其要求-强制烘培过程以消除氢脆性。除去强制烘培,PS-4220与 PS-79 完全相同。本标准同样包含对于机械镀锌层的要求。本标准覆盖,过去所有单独的和至今图纸上仍然涉及的以下标准:
PS-79 Zinc-Electroplated
PS-4220 Zinc-Electroplated - Hardened Steel Parts
PS-1536 Zinc-Mechanically Plated
PS-79 电镀锌
PS-4220 电镀锌-硬化钢
PS-1536 机械镀锌
1.3 Part Drawings 零件图纸
A. Requirements shown on the part drawing shall take precedence over the requirements specified in this standard.
B. Unless otherwise specified on the drawing, all brazing, welding, machining, forming, and heat treatment shall be completed before parts or assemblies are plated. Staking operations may be performed after the parts are plated.
C. The desired deposit thickness must be specified after the process standard number using a code designation. See Section 2.3.2.
D. A chromate, chemical surface trea
您可能关注的文档
最近下载
- 危大工程辨识清单.docx
- 小榨油厂生产工艺流程图(可修改).pdf
- 地铁施工测量题库2020版.doc
- 2024届安徽省合肥市肥东四中学九级八下英语期末联考试题含答案.doc VIP
- 【期中卷】人教版2021-2022学年九年级英语上学期期中测试卷 (一)含答案与解析.pdf VIP
- 【大单元教学设计】新统编版语文七年级上册第二单元 人间最美是亲情.docx VIP
- 2022-2023学年四川省广元市普通高校对口单招英语自考测试卷(含答案).docx
- 真题2023年9月全国事业单位联考《综合应用能力》试题及答案解析A类.pdf VIP
- NBT10115-2018光伏支架结构设计规程.docx
- 《仙人掌》-美术课件.pptx
文档评论(0)