鲁艺剧院 模板施工方案.doc

  1. 1、本文档共24页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
鲁艺剧院 模板施工方案

鲁艺剧院东棚户区改造项目B1地块 模板施工方案 江苏中南建筑产业集团有限责任公司 济南鲁艺剧院项目经理部 二〇一四年九月 目 录 一、编制依据 ··········································1 二、工程概况 ··········································1 三、施工部署 ···········································1 3.1模板选型及数量···································1 四、模板设计 ··········································3 4.1 墙体模板·········································3 4.2 平台模板·········································3 五、施工准备··········· ·································4 5.1 材料及主要工具···································4 5.2 作业条件·········································4 六、施工工艺 ··········································4 6.1基础导墙模板·····································4 6.2组合竹夹板墙模···································5 6.3大模板墙模·······································7 6.4梁、顶板模板·····································11 6.5楼梯模板········································12 6.6施工缝留置······································13 6.7模板拆除········································15 七、模板施工质量标准及质量保证措施·······················16 7.1模板施工质量标准································16 7.2 模板施工质量保证措施····························17 八、模板施工质量通病与防治·······························12 九、成品保护·············································12 十、安全生产、文明施工注意事项· ·····················12 十一、附图···············································18 模板工程施工方案 一、编制依据 1、鲁艺剧院东棚户区改造项目B1地块《施工组织设计》 2、鲁艺剧院东棚户区改造项目B1地块1#楼施工图纸 3、《混凝土结构工程施工质量验收规范》(GB50204-2002)(2012版) 4、《混凝土结构工程施工规范》(GB50666-2002)(2011版) 二、工程概况 1、本为济南华夏海龙房地产开发有限公司投资建造的鲁艺剧院东棚户区改造项目B1地块工程,位于济南市花园庄东路以东,花园路以南,山大路以西,山大北路延长线以北。由1#、2#、4#、6#住宅楼、地下车库及幼儿园组成。地下三层,地上、34、20、26层不等,地下室部分联为一体,地上各结构单元各自独立,地上高度为12~97米左右。由山东省建筑设计研究院设计,由山东贝特建筑项目管理咨询有限公司监理,江苏中南建筑产业集团有限责任公司承建。mm;大模板制作由我公司模板厂根据施工需要在场外进行加工制作。 1.3 顶板、梁模板:采用10mm厚竹胶板,非标准层支撑采用扣件式脚手架可调支撑体系,立杆间距不大于1000mm,次龙骨间距不大于300mm;标准层采用碗扣式快拆体系。 1.4 楼梯踏步模板:地下室楼梯采用10mm厚竹胶板制作根据图纸尺寸预先在场外定做;底模采用10mm厚竹胶板,支撑为钢管搭设,并配以可调支撑;主楼标准层采用公司钢制大模板。 1.5 根据施工段划分,1#每层竹夹板1800m2;大模板配制一层墙体大模;顶板竹胶板模板配备2层,悬挑构件配备3层模板及支架。2#每层竹夹板2300m2;大模板配制一层墙体大模;顶板竹胶板模板配备2层,悬挑构件配备3层模板及支架。4#每层竹夹板680m2

文档评论(0)

wyjy + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档