- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
紧水滩水电站设计说明书
摘 要
紧水滩电站紧水滩水电站位于龙泉溪上,是瓯江上游干流梯级开发的第一级水电站,工程以发电为主,兼顾航运、放木及防洪等综合利用要求。
该工程采用高水头大坝,挡水建筑物为混凝土重力坝,泄水建筑物为溢流坝,在洪水季节,河流最大泄流量为20000m3/s,此时用溢流堰泄流。
设计洪水位为289.94m,校核洪水位为291.8m,正常蓄水位为284m,设计死水位为264m,坝顶高程293m,坝基开挖至高程192m,整个坝高99m,坝底高程194m。上游坝坡坡度0,下游坝坡坡度1:0.75,溢流坝堰顶高程274.3m。
本枢纽河谷底宽90m左右,坝顶高程处坝轴线长285m,根据布置,溢流坝段布置在河床中间偏右岸,厂房布置在左岸。因左岸比较平缓,可布置开关站,电厂办公管理用房设施。。
该工程采用坝后式水电站布置方式,通过计算选用了混流式水轮机型,其直径为3m,转速为214.3r/min。发电机为SF45-28/653.9。安装水轮发电机组4台, 单机容量5万千瓦,总装机容量为200000kw。厂房宽为18m,长为74m, 水轮机安装高程205.675m,发电机层高程211.3m,装配场层高程211.3m(与进厂公路同高程)。各个枢纽建筑之间由公路相连,它连接了包括安装场、尾水平台、大坝和闸门启闭室等设施。
另外,本设计还对机墩进行了布置和专门的配筋设计。
关键词:水利枢纽;挡水建筑物;泄水建筑物;稳定;应力;水轮机;发电机;选型;厂房;机墩。
ABSTRACT
Jin-shui-tan hydroelectric station is located on Long-quan stream which is the first hydroelectric station of the upper mainstream of Ou river. The primary effect of the whole engineering is generating electricity that also meets the demand of shipping, drift wood, flood control and etc.
This engineering adopts high-lift dam, which use concrete gravity dam to prevent the water and overflowing dam to sluicing. When it occurs flood, overflowing weir is used to spill over the flood, whose biggest rate of flow reaches 20000ms/s. According to the design of dam, the details are as following: designed flood level is 289.94m; revised flood level is 291.8m; the normal level of storing water is 284m; the designed lowest level of water is 264m; the top height of dam is total 293m; the foundation of dam arrives to 192m height; the total height of dam is 99m; The upstream dam slope is 0 ,the downstream dam slop is 1:0.75 the width of of bottom of river vale to this hinge is about 90m; the length of axis on top of dam is 285m; According to disposal, the overflowing dam lies near the right shore of riverbed, whereas factory lies on left shore, because the left shore is much flater which can lay the switch station and facilities of office.
This engineering uses such disposal that the hydroelectric station is behind the dam. Via calculation, we choose t
您可能关注的文档
最近下载
- Midea 美的 TQN36TXJ-SA蒸汽炉 说明书.pdf
- 项目管理流程培训课件.pptx VIP
- 湖南省长沙2025年七年级下学期数学期末考试试卷附参考答案 .pdf VIP
- 电气工程施工方案(5).docx VIP
- 90附件广西桥梁检测评定技术规程.pdf-DB45.PDF VIP
- 2023年小学教育教学知识与能力重点知识点.doc VIP
- 新人教版五年级数学上册《位置(全部)》精品PPT优质教学课件.pptx VIP
- 多因子选股系列研究之三:个股波动率的变动及“勇攀高峰”因子构建.pdf VIP
- 2023年小学教育教学知识及能力重点知识归纳.pdf VIP
- 广西城市桥梁健康监测系统技术规程.docx VIP
文档评论(0)