网站大量收购独家精品文档,联系QQ:2885784924

快速卷帘门安装及调试 英文说明书.doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
快速卷帘门安装及调试 英文说明书

Rapid rolling door Installation instructions I.The tools for installation work Impact drill (with 14 mm, 12 mm, 6 mm drilling bit), hand drill (with self tapping screw, drilling bit, etc.), polishing machine, pneumatic hand riveter, electric welding machine (optional), 14/17, 12/22 wrench tool II.Installa Door lay the doorcase on the ground flat,fixed the rail on the doorcase(with 10mmX20 screw,nut,8 pc screws),erect the the doorcase with machine or human force, and then with 14mm impact drill drilled the hole after fix the doorcase installation position.use expansion screws fix doorcase,install the rail on the groun or wall. Fix the motor on the motor plate(8mm X 20 size screw,4 pcs),insert the latch into keyway,and then put the motor on the axis of the door shaft.(with 12mmX70 screw fix motor plate on the side plate of the doorcase,set the encouder on the small axis(beside motor),encoder outside fix on the motor,inside rotate part fix on the small axis(fasten the Hexagon screws,and fix the stainless plate which one the encoder). III.High Speed door debugging illustration The wiring column displayed as follows: : Connection details: Power supply: live wire is L,L,L, null line is N Motor: the motor, U, V, W line connected to the terminal, U, V, W line respectively (matched each other), If reversal,adjust two of three line U,V,W random,and the other two line connect to LO2,NO1. Encoder: green, yellow, brown, white, connect to XO, X1, 24V, 0V respectively ( if the door not working after limited is ok,interchange the X0 and X1 line). Infrared connection : blue and white connect to 0V, brown connect to 24V, black connect to X7. another 24V brown, blue 0V。 Magnetic connection: 1, 2 connect to 220 v power supply(L,N); 3, 4 connect to X7, COM respectively; 7, 8 connect to coil respectively. Manual button: green button 24 connect to terminal X2, red button 24 connect to terminal X3, emergency stop button 4 connect to termina

文档评论(0)

xcs88858 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8130065136000003

1亿VIP精品文档

相关文档