- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
new08-B737-06 液压油箱
液压油箱勤务 编号:08-B737-06
A/P TYPE: B737CL
A. General
(1) If the complete loss of hydraulic fluid has occured, accomplish Hydraulic Fluid Replacement procedure.
(2) If the hydraulic reservoir was filled after the replacement of a component or after fluid loss, accomplish Bleed the Hydraulic System procedure.
(3) The equipment that is necessary to fill the hydraulic fluid is on the forward bulkhead of the right wheel well. The equipment includes a hand pump, a pressure fill connection, a filter for the hydraulic fluid, and a selector valve.
(4) There is a fluid quantity indicator on the system A and B reservoirs. The system B reservoir is filled through the standby reservoir. When the fluid quantity indicator for system B shows full, the system B reservoir and the standby reservoir are full.
(5) The fluid chilling at high altitude and the large ambient temperature changes between departure and arrival locations can result in a decrease in fluid levels. These cold soak effects will not have an impact on the operation of the systems but it can shrink the fluid sufficiently to indicate a need for servicing, even if you serviced the reservoirs at a warm location before the previous flight. Under such circumstances, if you service the airplane high at the cold location before the airplane is sent back to the warm location, it is possible that you will cause an overfill of the reservoir and fluid can overflow from the drain line.
(6) If the ambient temperature on the ground is 20 F or lower at an arrival location and a fluid level is below REFILL, service the reservoir to just above REFILL to avoid the overflow of fluid at the next warmer location.
B. Hydraulic Reservoir Servicing Procedure
Step-1 Remove hydraulic power (WARNING-1).
Step-2 Make sure the flaps and the leading edge devices are up.
Step-3 Before you fill the system B reservoir, make sure the brake accumulator has a minimum of 2800 psi of pressure in it (with the hydraulic pumps off).
Step-4 If you use the hand
您可能关注的文档
- 1995年10月语法翻译.doc
- 朱宏宇毕业论文《文理分科》.doc
- 租赁合同中英文(纯).doc
- DOC-WX3:现场巡检报告模板.doc
- Unit 19 Language教师版.doc
- C++资源管理.docx
- 匈牙利商务签证.doc
- 留学申请FAQs.docx
- 高级英语1 lesson7 课文原文.doc
- Android常用技巧.docx
- 中国国家标准 GB/T 45390-2025动力锂电池生产设备通信接口要求.pdf
- 中国国家标准 GB/T 45393.2-2025信息技术 建筑信息模型(BIM)软件 第2部分:参数化模型.pdf
- GB/T 45393.2-2025信息技术 建筑信息模型(BIM)软件 第2部分:参数化模型.pdf
- 《GB/T 45393.2-2025信息技术 建筑信息模型(BIM)软件 第2部分:参数化模型》.pdf
- GB/T 10184-2025电站锅炉性能试验规程.pdf
- 海尔智家股份有限公司海外监管公告 - 海尔智家股份有限公司2024年度环境、社会及管治报告.pdf
- 上海复旦张江生物医药股份有限公司2024 环境、社会及管治报告.pdf
- 中国邮政储蓄银行股份有限公司中国邮政储蓄银行2024年可持续发展报告.pdf
- 豫园股份:2024年环境、社会及管治(ESG)报告.pdf
- 南京熊猫电子股份有限公司海外监管公告 - 2024年度环境、社会及治理(ESG)报告.pdf
最近下载
- 骨科无菌术 手术区域的准备.pptx
- 《海岸带生态系统现状调查与评估技术导则 第7部分:牡蛎礁》(报批稿).pdf VIP
- GB4943-2001 信息技术设备 安全 第1部分:通用要求.pdf
- 基于舞弊风险因子理论的柏堡龙财务舞弊案例研究.pdf
- 《海岸带生态系统现状调查与评估技术导则 第5部分:珊瑚礁》(报批稿).pdf VIP
- 建筑施工安全风险辨识和分级管控指南、台账、企业安全风险分级管控清单.docx VIP
- 2025年施工员考试题库及完整答案【名师系列】.docx VIP
- 2025年施工员考试题库附完整答案【夺冠】.docx VIP
- 2025年白蚁防治员岗位职业技能资格知识考试题库(附含答案).docx
- 国际护士节护理操作技能竞赛理论题库.docx
文档评论(0)