exotic来自异国的(exotic从外面来的).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
exotic来自异国的(exotic从外面来的)

When authorities department had concrete to adsorb or glued to connect template, can use to pry stick in the template next point of contact loose move, forbid to pound Template. The template carries on plank noodles to clean up in time after toring down, Tu Shua insulates and prevent°froms gluing to connect ash syrup. Hanging arm to reach a template to tore down should match next say rules:Side mold, strong can promise in the concrete its surface and sharp angle not because of Tore down template but damaged bad after, the square can tore down.Bottom mold can tore down template at 75% squares of concrete strength. The stairs plank mold tores down, should promise that the concrete strength attains 75% of design strength. Template in the door, window and entrance to cave tores down, promise the concrete strength attain 1 MPa. 6.3.12The template starts construction quality standard (1)Template and it accept to have enough strength, just degree and stability, disallowed occurrence bottom to sink and transform, The template seamy side is neat, the joint is tight, and taking off a mold Tu Shua is even. (2)Sprinkle to build to send a specially assigned check in the concrete process, discover that transforming is loose to move a phenomenon to fix in time whole reinforce. (3)Need to check to button up a piece while sprinkling to build concrete, to pull a stud bolt nut tightly solid circumstance. (4)Attention finished product while dismantling a mold protection, forbid to at will break wall noodles to use or the big hammer is malicious to hit a wall of noodles. (5)The template wears wall stud bolt should tightly solid credibility, prevent°from the concrete impact entrance to cave template while sprinkling to build, promise entrance to cave two sides The concrete is symmetry, even sprinkle to build. (6)The big steel template pays the mold quality check standard to see table 6-3. 31 Table 6-3 greatest steel the template pay mold quality check standard The ordinal number item nam

文档评论(0)

xcs88858 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8130065136000003

1亿VIP精品文档

相关文档