- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
the time safety barrier or Zhang Gua safe net, protection railing from top
The next two arm-rest pillar constitutes and ascends arm-rest to leave the ground 1~1.2 ms and descends arm-rest to leave the ground 0.4~0.6 ms, the arm-rest is each
The 2 ms establishes pillar.
(2)The entrance to cave of building plank, see its size and construction process in of may adopt measure, large hole
The periphery of adds a protection railing, elevator etc. up and down keeps several entrance to caves of , and each l 0 ms highly establishes an Anne
Whole nets, the entrance to cave hardly using in the construction process can add Han reinforcing bar at the time the net Be fixed to cover, to usually make
The entrance to cave of using adds a movable cover, having already attached a thing may result in the dangerous entrance to cave encrypt to shut a cover.
(3)The entrance to cave of key figures building has to have specially assigned management, usually check protection measure of credibility and over
Have sex.
(4)Make to hand over so much and then homework protection the , well, the construction passage want to put up a pair of layers insulation Peng.At face
The entrance to cave neighborhood prohibit to deposit a miscellaneous articles or objects.Transport inside the certain scope in the perpendicularity, the personnel runs about and rows an appropriation
Route, dont insulate measure not must in the same perpendicular side up and down hand over again homework, dismantle a scaffold to wait hard avert from
Homework of crossing, row forbid boundary, is served as guardian by the specially assigned.
(5)Climb a homework:The structure structure that climbs tools and implements, have to prison degree credibility.The base of horizontal feet should
Being airtight is solid, dont get mat high use, inclined support of carry should have fix measure, the horizontal foot should have antiskid measure.Sign
The pole slope takes 60 °~70 ° as proper, marking time can not have already lacked a file phenomen