- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
毕业设计学士钢结构中英文对照翻译
Steel Structure Construction Scheme
Ⅰ.A brief account of steel structure work
There will be 6 8t bridge traveling cranes in production hall, welding H-section steel column and beam, structural main material is Q345B, cold bending sheet steel Z-purlin, wall and roof cladding are double-skin pressed steel sheet and thermal insulation wool.
Ⅱ.Characteristic of steel structure work
The single span of the work is 18m, the height of steel column is large, single frame plane external rigidity is very small, so the key point of safety technical control is to guarantee the stability outside the structural plane.
Take out 6 steel columns from grid line 9~14 in the production building, instead of 52.5m space truss as trimmer beam to support the upper structure and crane load, the installation of the space truss is a difficulty point of this work.
Ⅲ.Fabrication of steel structural members
Technical preparations prior fabrication
1. Study and check the design working drawing before fabrication, make shop drawing and get approval from designer then prepare material for fabrication.
2. Make a plan and program for fabrication as per the type, quantity and material of the structural members.
3. Write construction techniques and technical measures, and the equipment regular examine and maintain plan, keep the machinery in good condition.
Material requirements:
1. Select and confirm the material for the project.
2. All kinds of material should be with quality guarantee and ex-factory certificate. If there is any doubt, sampling examination should be taken according to relevant national standard, only when passed the examination material in batches can be used.
3. Rust degree of steel surface should conform to the present national standard rust and rust removal degree before painting.
4. Jointing material (welding rod, solder, flux), high strength bolt, and coating( under coat and top coating) should be with ex-factory quality certificate and conform to the design and national sta
您可能关注的文档
最近下载
- 静脉输液考试试题及答案.docx
- 2024-2025学年小学信息技术(信息科技)四年级上册湘科版(2024)教学设计合集.docx
- Tecsun德生PL368使用说明书.pdf
- 港口城市发展的动态研究——兼论上海国际航运中心建设-产业经济专业论文.docx VIP
- 第一单元起始课课件(34张PPT)2021-2022学年统编版高中语文必修上册.pptx
- 人教版七年级上册历史课件(全册).pptx VIP
- 桥本氏甲状腺炎课件.ppt VIP
- 完整word封条样式.doc VIP
- 老年人体重管理.pptx VIP
- 输变电工程数字化移交技术导则第1部分:变电站(换流站)[附编制说明],Q_GDW11812.1-2018.pdf VIP
文档评论(0)