- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
050238-M328LCD测试仪(散)
M8 Transistor Tester Ver.12864 )
Installation Instruction
Thank you for purchasing our M8 Transistor Tester Kit
Tools. We believe our product will bring you an experience of
convenience and accuracy.
Before your installation process, please carefully read this
instruction, which will facilitate your installation in a more rapid
and accurate way.
1. Installation:
The first step is the Resistance Welding. If you are not
familiar with the chromatic circle, please check the resistance
with the multi-meter.
Next, weld the other electrical components based on , and
please be aware of the type and direction of the transistor:
The welding direction of the LED: There is an aligned side that
is the same with the PCB sign. Please note that the welding time
of the LED should not be kept too long in case that the LED
could be damaged.
The electrode of the electrolytic capacitor should be aligned
with the PCB side with white line.
After all the welding j obs have been done, please connect the
electric power instead of connecting Atmega328 and LCD(9V
battery or external 5.5-12V DC power), and measuring the
voltage of the pin7 and pin22 on the IC plug by using the
multi-meter, and the voltage should be +5V(the button should be
pushed when measuring), which means the circuit and power are
working in normal condition.
Cut off the power, and connect M328 and the LCD which is
welded with the insert pin(8Pin, 5-12). Be aware of the direction
of IC.
After all the installation, connect the power(9V 6F22 battery,or
5.5V-12V DC power). Push the buttton, you will see the
character . Congratulations, the gadget could be put in use!
2. Selftest and Calibration
The selftest can be prepared by connecting all three test ports
together and pushing of
文档评论(0)