巷道支护与设计_毕业设计.docx

  1. 1、本文档共65页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
巷道支护与设计_毕业设计

摘要巷道是井下生产的动脉,巷道断面设计合理与否,直接影响矿井生产的安全和经济效益。为满足东周窑煤矿四盘区的正常采掘,设计2401顺槽作为煤矿采掘的服务巷道。设计的主要思路,是采用类比设计与理论验算相结合,主要参数查询设计规范得出。在巷道断面设计中,充分考虑行人、交通、通风等因素,选择一种经济适用的断面形式。巷道掘进设计是在安全的前提下,充分利用地质情况,选择合适的掘进方式。在岩质疏松的地段,采用综掘机掘进,在地质复杂,岩质较硬的地段,采用钻眼爆破的方式进行掘进,两者交替进行,使掘进速度达到最大最经济。巷道掘进主要采用炮掘加机掘的形式,在岩层比较硬的地段采用炮掘的形式,遇到薄弱岩层就改用机掘形式。巷道总体分三段,有系统巷皮带机头段、系统巷储带仓段和正巷组成。在巷道的设计过程中需要经过两次变换断面,支护形式和断面开掘都需要进行调整。关键词:岩土工程;支护形式;断面形式;施工工艺;爆破设计AbstractThe roadway is the artery of underground production, the design of the roadway section is reasonable, which directly affects the safety and economic benefits of the mine production. In order to meet the normal mining of Dongzhouyao coal mine four area, design 2401 trough as coal mining roadway service. The main idea of the design is to use the analogy design and theoretical calculation, the main parameters of the query design specification.In the design of the roadway section, the factor of pedestrian, traffic and ventilation is considered, and the form of a kind of economic application is chosen.. The tunnel excavation design is thepremise of safety, make full use of geological conditions, choose the right tunneling way. In lots of rock loose, using fully mechanized roadheader, in complex geological, lots of hard rock, the drilling hole blasting excavation, alternating between the two, so that the driving speed reach the largest and most economic.The tunnel excavation adopts the form of the digging machine and the hard rock in the strata. The hard rock is used in the form of the blasting, and the weak rock layer is used to dig the form.. There are three sections in the tunnel, which is composed of the section of the belt head of the system, the warehouse section and the normal lane of the system.. Need to go through two transformation section in the design process of roadway, supporting form and digging section need to be adjusted.Keywords: geotechnica; engineering; support form; section form; construction technology; blasting design.目 录摘要IAbstractII第一章 绪论11.1 国内外发展概况

文档评论(0)

zhuwenmeijiale + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:7065136142000003

1亿VIP精品文档

相关文档