- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
高中信息技术新课程教学设计漫谈---周子春
高中信息技术新课程教学设计漫谈
湖南省常德市鼎城区第一中学 周子春
(建议,既然是课题成果,应该多体现出其研究性、学术性,不能过于单一强调体会,可尽量围绕新课程背景下高中信息课程教学设计的科学性、有效性,将是非常好的一项成果。因为该刊是面向全国公开发行,同时也体现出了您的教学水平和理论水准,对学校也会产生积极的影响。
the construction site, and coordinated the implementation of protective measures. 7.10 the main control requirements of 7.10.1 site acceptance of equipment and materials equipment and material comes into play, construction unit should, in conjunction with the relevant units (equipment manufacturers, construction unit, supervisor or management units, etc)recorded on the maintenance tab. 7.8.3 products protective duties with the conversion and transfer of responsibility for construction, maintenance work of the product should be handed over. 7.8.4 for commissioning of power plant equipment and systems should be run or are under construction in the equipment or system to make the necessary isolation, not to operate the valve, switch hanging sign, ensure that the test devices are not mistakes. 7.8.5 products during the transfer of product maintenance cards should save the transfer of project management. 7.9 product after the change of protection sought after product by project Department according to customer requirements and the specific circumstances of
the construction site, and coordinated the implementation of protective measures. 7.10 the main control requirements of 7.10.1 site acceptance of equipment and materials equipment and material comes into play, construction unit should, in conjunction with the relevant units (equipment manufacturers, construction unit, supervisor or management units, etc)recorded on the maintenance tab. 7.8.3 products protective duties with the conversion and transfer of responsibility for construction, maintenance work of the product should be handed over. 7.8.4 for commissioning of power plant equipment and systems should be run or are under construction in the equipment or system to make the necessary isolation, not to operate the valve, switch hanging sign, ensure that
文档评论(0)