优秀河北某高速公路土建施工LQ11合同段施工组织设计.doc

优秀河北某高速公路土建施工LQ11合同段施工组织设计.doc

  1. 1、本文档共111页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
优秀河北某高速公路土建施工LQ11合同段施工组织设计

摘要 施工组织设计是从工程全局出发,根据工程的特点和设计图纸按照工程项目的客观规律及项目所在地具体施工条件和工期要求统筹考虑施工活动中人工、材料、机械和施工方法等要素,对全部工程的施工工艺、施工进度和相应的材料消耗等做出科学合理的安排,为施工生产活动的连续性、协调性、均衡性和经济性提供最优方案。施工组织设计是建筑施工组织的核心和灵魂, 关键词:Abstract The construction organization plan is from the engineering design of the overall situation, in accordance with the characteristics of engineering design drawings and engineering projects in accordance with objective laws and the specific construction project site conditions and project requirements to consider coordinating the activities of artificial construction, materials, machinery and construction methods, such as the elements of all the works of construction technology, construction progress and the corresponding consumption of materials to make scientific and reasonable arrangements for the construction of the continuity of productive activities, coordination, balance and economy to provide the optimal program. The construction organization plan is the construction organizations core and the soul. This article first works on the basis of organization and structure, engineering, project profiles, including (starting Ending mileage, geographic location, construction conditions etc.), then describes the works as well as the construction of the overall deployment of the overall arrangements. Finally on the security and the civilized construction measure do a simple narrative. Thesis detailed presentation of the main projects of the construction methods and construction technology.Construction scheme and make full use of this method in engineering construction enterprise years of accumulation of experience, reasonable construction, make the labor organization arrangement, construction machinery, the biggest work on construction of facilities, reduce unnecessary section Jane practical engineering cost, reduce the cost of projects. In the construction of key processes, actively promote the cautious and new technology, new technology, new material and new equipment, increase efficiency

文档评论(0)

2017meng + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档