DNV动力定位系统4_Lars_day2.ppt

  1. 1、本文档共39页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
DNV动力定位系统4_Lars_day2

Day 2 AUTR (Class 2) and AUTRO (Class 3): - Failure modes - Redundancy - Separation (AUTRO) - General arrangement Failure Modes and Effect Analysis (FMEA) Consequence analysis Environmental Regularity Number (ERN) Preparations before DP operations Documentation Single Failure Failure definition: Class Notations and Single Failure Single Failure AUTR Any active component or system Single Failure AUTRO All components in any one fire sub-division, from fire and flooding Single failure Example ME No.1 shut-down Case II – Single failure Hai Yang Shi Yo 299 Redundancy, Separation, Selectivity Independence Redundancy The ability of a component or system to maintain or restore its function when one failure has occurred. Redundancy Redundancy Separation (AUTRO) Physical separation by installation of equipment in two different compartments. Separation by bulkheads which are to be fire-insulated by A60 class division, and in addition are to be watertight if below the damage waterline. General arrangement AUTR and AUTRO General arrangement Arrangement for AUTRO General arrangement Hai Yang Shi Yo 299 Case III - Redundancy Case III - Redundancy Case - Possible solutions FMEA Failure Mode and Effect Analysis FMEA- Failure Mode and Effect Analysis The FMEA should be a complete document including all necessary drawings and descriptions FMEA- Failure Mode and Effect Analysis Documentation FMEA- Failure Mode and Effect Analysis FMEA- Failure Mode and Effect Analysis The test: - Confirms the main failure modes as prescribed in the theoretical analysis - Verifies all statements and conclusions of FMEA - Can verify several conclusions by one test, e.g. by a partial blackout In general, the following tests will be required: - Partial black-out on the main- and distribution switchboards - Loss of distribution board or equipment with dual power supply - Loss of (black-out) each battery and UPS distribution - Loss of signals (control, feedback, sensors, reference systems, e

文档评论(0)

yurixiang1314 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档