- 1、本文档共39页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
DNV动力定位系统4_Lars_day2
Day 2 AUTR (Class 2) and AUTRO (Class 3):- Failure modes - Redundancy- Separation (AUTRO)- General arrangement Failure Modes and Effect Analysis (FMEA) Consequence analysis Environmental Regularity Number (ERN) Preparations before DP operations Documentation Single Failure Failure definition: Class Notations and Single Failure Single Failure AUTR Any active component or system Single Failure AUTRO All components in any one fire sub-division, from fire and flooding Single failure Example ME No.1 shut-down Case II – Single failure Hai Yang Shi Yo 299 Redundancy,Separation,Selectivity Independence Redundancy The ability of a component or system to maintain or restore its functionwhen one failure has occurred. Redundancy Redundancy Separation (AUTRO) Physical separation by installation of equipment in two different compartments. Separation by bulkheads which are to be fire-insulated by A60 class division, and in addition are to be watertight if below the damage waterline. General arrangementAUTR and AUTRO General arrangement Arrangement for AUTRO General arrangement Hai Yang Shi Yo 299 Case III - Redundancy Case III - Redundancy Case - Possible solutions FMEA Failure Mode and Effect Analysis FMEA- Failure Mode and Effect Analysis The FMEA should be a complete document including all necessary drawings and descriptions FMEA- Failure Mode and Effect Analysis Documentation FMEA- Failure Mode and Effect Analysis FMEA- Failure Mode and Effect Analysis The test:- Confirms the main failure modes as prescribed in the theoretical analysis- Verifies all statements and conclusions of FMEA- Can verify several conclusions by one test, e.g. by a partial blackout In general, the following tests will be required:- Partial black-out on the main- and distribution switchboards- Loss of distribution board or equipment with dual power supply- Loss of (black-out) each battery and UPS distribution- Loss of signals (control, feedback, sensors, reference systems, e
您可能关注的文档
- DFX培训2.ppt
- DHA与智力发展(PPT-60).ppt
- dialux初步教程(ppt).ppt
- Dielectric Constants[介电常数](PPT-54).ppt
- DIALux初步教程(修改).ppt
- dim_洁净室区的基本要求以及测试维护(ppt49).ppt
- DIGSI4.7 支持中文操作的保护装置服务软件!介绍.ppt
- Direct V5.0三维地质建模.pptx
- Director 11 多媒体开发实用教程 CH01.ppt
- Director 11 多媒体开发实用教程 CH05.ppt
- 第十一章 电流和电路专题特训二 实物图与电路图的互画 教学设计 2024-2025学年鲁科版物理九年级上册.docx
- 人教版七年级上册信息技术6.3加工音频素材 教学设计.docx
- 5.1自然地理环境的整体性 说课教案 (1).docx
- 4.1 夯实法治基础 教学设计-2023-2024学年统编版九年级道德与法治上册.docx
- 3.1 光的色彩 颜色 电子教案 2023-2024学年苏科版为了八年级上学期.docx
- 小学体育与健康 四年级下册健康教育 教案.docx
- 2024-2025学年初中数学九年级下册北京课改版(2024)教学设计合集.docx
- 2024-2025学年初中科学七年级下册浙教版(2024)教学设计合集.docx
- 2024-2025学年小学信息技术(信息科技)六年级下册浙摄影版(2013)教学设计合集.docx
- 2024-2025学年小学美术二年级下册人美版(常锐伦、欧京海)教学设计合集.docx
文档评论(0)