钟吕水利枢纽复合土工膜防渗面板堆石坝设计说明书 好
钟吕水利枢纽复合土工膜防渗面板堆石坝设计说明书【毕业设计(论文)】-好
Abstract
The purpose of this design is to develop the water resources of B Jiang Basinconstructing a power-based taking into account irrigation water supply flood protection and aquaculture Etc of comprehensive utilization efficiency such as the development of inter-basin water conservancy and hydropower project
After clearing the purpose of the construction having the basis and conditions of the construction the project is designed as followsB Jiang Project is a composite geomembrane impermeable rock-fill dam height of 530minstalled 6400kWthe design head of power station is 174m the firm capacity is 1461kWwith two engine unit of 3200Kwthe normal water level is 2755mthe length of the main dan is about 2365mthe upstream slope is15 and downstream slope is 14
The primary coverage of the design is ascertain the crest elevationPa-selection the first major building design construction organization design And composed the tender documents of the diversion tunnel and focus on the design special topicthe diversion tunnel construction organization
Impermeable composite geomembrane rockfill dam is a new type of dam the impermeable materialcomposite geomembranethe design construction quality control is the dam of such key technology in the design of Chapter VI of the third statement Festival are explained in more detail
The diversion tunnel construction project have the characteristics of small construction work on the section tight time limit so its construction technology is the key in the design have the specification of a detailed explanation
The design is refer to the general CFRD and some of geomembrane rockfill dam which has been build Pay attention to the detail design of the independent sub-item at the same time considering the unity of the overall projectIn the design of the topic referencing the diversion tunnel that had build the construction of diversion tunnel design organizations is to ensure that the scheduled completion