Well Completion and Stimulation——Chapter_7_Sand_control_newest.doc

Well Completion and Stimulation——Chapter_7_Sand_control_newest.doc

  1. 1、本文档共51页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Well Completion and Stimulation——Chapter_7_Sand_control_newest

Chapter 7 Sand Control Sand production is usually associated with wells which are completed at shallow depths of tertiary age. It can also be associated with unconsolidated formations encountered in depths of 16,000 feet or deeper. The appropriate selection of well completion practices is critical in formations that have a tendency towards sand production. Very often problems of sand production are created due to inadequate completion practices. According to Allen and Roberts, 1989 and DePriester, 1972 producing sands are solids that form part of a mechanical structure in formations. Loosely attached fines on the pore surface are always produced and are beneficial because the more they are free to move, the less likely they are to plug the pore by forming bridges across the pore channels. Most sandstone reservoirs can be described as: Solids smaller than 90 percentile are interstitial fines and are produced when production is initiated. Solids between 90 and 75 percentile range bear the smallest formation load and are likely to be produced. Solids larger than 75 percentile are load bearing solids. If a significant part of solids are produced (50-75 percentile) they will certainly present production problems. From past experience industry has developed a basic strategy for controlling sand production. For example, for oil wells in the Gulf Coast, the limit of sand production is considered to be 0.1 percent or 900 lbs/1000 bbl (28gm/m3). In wells with high GOR (10,000 scf/bbl) the limit is set at around 10lbs/100bbl (28gm/m3). In areas where costs of well operation is high, such as the North Sea, this limit is set at as low as 5 lbs/1000 bbl (14 gm/m3). There has been no norm for gas wells as it has been difficult to estimate a sand production limit. Historically, the limit for gas wells was determined based on the erosion in chokes, probes etc in flow lines. Sand production causes reduction in hydrocarbon production and reduces life of subsurface and the surface e

文档评论(0)

qwd513620855 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档