- 10
- 0
- 约1.17万字
- 约 29页
- 2018-03-09 发布于河南
- 举报
RH 顶枪 Anlagen
Operation InstructionsSafety management of combustibles for the main burnerCOG and fuel gas operating pressures are monitored with the13K4, 13K5 und 13K7. The push-type switches are fitted on the “top lance system”. In the event of higher or lower deviations, an error message is displayed via the 20P0 Text Panel.?The main burner’s three control checks make up the safety chain for the 13K8 safety relay. This safety relay must be enabled manually by the 13S9 button. The start status is signalled potential free to the PLC.In the event of a failure, an error message is signalled via the 18P2 light
您可能关注的文档
最近下载
- 40米t梁预制梁施工方案.doc VIP
- 中兴通讯电源产品介绍课件-图.pptx VIP
- 《给你一个全新的家:未来的衣食住行》青少年教育书籍.pdf VIP
- 光伏工程施工方案范本(3篇).docx VIP
- 电大公共行政学第十三章自测答案.docx VIP
- 2026年四川烟草公司招聘考试真题.docx
- 《TCES243-2023构网型储能系统并网技术规范》.pdf VIP
- TJAASS 133-2024 朱顶红蜡封球生产技术规程.pdf VIP
- XF_T 3005-2020 单位消防安全评估.docx VIP
- QSY XN 0602-2022《城镇燃气无人值守输配气站信息化建设规范》.pdf VIP
原创力文档

文档评论(0)