网站大量收购独家精品文档,联系QQ:2885784924

新产品试生产控制程序NewProductIntroductionTrialRunControlProcedurHiP-WSHT-IOP-Q047V2.1.doc

新产品试生产控制程序NewProductIntroductionTrialRunControlProcedurHiP-WSHT-IOP-Q047V2.1.doc

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
新产品试生产控制程序NewProductIntroductionTrialRunControlProcedurHiP-WSHT-IOP-Q047V2.1

修订记录 Revision History 编制人 日期 修订内容 版本号 Author Date Change Description Rev Lai Denghong 24/Nov/2005 First Release 1.0 Lai Denghong 7/Dec/2005 Correct document title and add mold test report 试模报告 2.0 He YaFeng Change Document Format 2.1 批准 Approvals 职位 姓名 签名 日期 Position Name Signature Date 1. 目标 1. PURPOSE 1.1 对新产品前期的注塑、喷涂、装配等的过程试验,调试及优化缩短新产品引进过程的周期,确保按时交货,并为新产品进入大批量生产制定优化工艺及程序。 1.1 Set up optimize process in Molding, Painting and Assembly to ensure delivery on time and shortest cycle time for new product introduction and ramp up. 2. 范围 2. SCOPE 2.1 适用于本公司所有试生产的通讯塑胶电子类产品 2.1 Applicable to all wireless new plastic products. 3. 职责 3. RESPONSIBILITIES 3.1 注塑负责公司制造或外来注塑模具的注塑过程 3.1 Molding department is in charge of new product molding process. 3.2 喷涂负责新产品喷涂移印过程 3.2 Spray painting department is in charge of new product spray painting and pad printing process. 3.3 装配负责新产品装配过程 3.3 Assembly department is in charge of new product assembling process. 3.4 物流部负责提供试生产所需要的原辅材料 3.4 Logistic department is in charge of supplying all raw materials for trial run. 3.5 物流部计划负责制定、下达试生产计划 3.5 Logistic planning department is in charge of new product planning and issuing trial run plan. 3.6 工艺工程师负责生产工艺的制定、调整 3.6 Process engineer is in charge of setting and improving the process parameter and technology. 3.7 注塑、喷涂、装配技术员负责按作业计划,根据工艺文件要求进行控制,并及时的掌握信息,反馈给制程工程师、质量部,并负责所使用的现场清洁,负责试生产产品的入库 3.7 Molding/spray painting/assembly technician is in charge of operating according to trial run plan, controlling the process according to WI, providing the feedback/information to process engineer and QA in time, keeping the cleanliness of line and sending trial run products to store on time. 3.8 质量部负责现场量具和检测设备的控制,检验并确认产品的质量 3.8 QA department is in charge of all measuring fixture, gages and testers and ensure product quality meet specification. 3.9工业工程设备人员负责提供适宜的设备,并对之进行保养、维护、检修。保障能源的供应,工业工程设计人员负责工装夹治具,包装材料方式等的设计及导入工作 3.9 IE department industrial engineer

文档评论(0)

qwd513620855 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档