- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
设备及管路安装方法英文翻译
Table of Content
1. Main facilities in the plant 2
2. The requirements before equipment installation 2
3. Construction preparation 2
4. Installation procedure 3
5. Equipment unpacking test 3
6. The main facilities installation method 4
6.1 Inlet pump installation 4
6.2 Coarse and fine screen installation 5
6.3 Screw conveyor 5
6.4 Grit and grease scrapers installation 7
6.5 The Roots blower installation 8
6.6 The aeration diffusion system Installation 9
6.7 Primary and secondary sedimentation half bridge mud scrapers installation 10
6.8 Submersible mixers installation 12
6.9 Electromagnetic flowmeter installation 13
6.10 The chlorination system Installation 13
6.11 Pumps installation 15
6.12 Pipes and auxiliaries installation 16
Main facilities in the plant
There are a variety of facilities in the plant. Here offers the initial introduction to installation of major equipment. The plant includes the facilities on the list:
a. Inlet pump
b. Coarse and fine screen
c. Screw conveyor
d. Containers
e. Press
f. Aeration blowers
g. Grit and grease scrapers
h. Grit washer
i. Ventilator
j. Half bridge scrapers
k. Submersible mixers
l. Gravity belt thickeners
m. Thermal power of heat exchanger unit
n. Belt filter press
o. Electromagnetic flowmeter
p. Pumps
q. Pipes and auxiliaries
The requirements before equipment installation
1. Equipment base, equipment, plant (including glass doors and windows, lighting, etc.) be completed and the assembly is complete, embedded parts in the correct position;
2. Equipment transport routes open and to reinforce the plant at the entrance channel has been set aside by the maximum size of equipment;
3. Equipment to install temporary water, electricity and gas have been sent to the device edge, facilitating the construction use.
Construction preparation
1. Equipment, all technical data, drawings, manuals, product certification, all kinds of test records, procedures, norms, standards and related technical documentation required to prepare comp
您可能关注的文档
最近下载
- 汉得微扬-西凤酒CRM项目投标建议方案 20170106.pptx VIP
- 信用证试题库及答案.doc VIP
- 汉得信息_陆家嘴商业地产项目_投标文件_V2.02.pptx
- 医疗器械体系文件-软件部署管理规定.doc VIP
- WPS Office2019办公应用教程课件 项目四 WPS文字的图文混排.pptx VIP
- 汉得信息_陆家嘴商业地产项目_投标文件_V0.03.pptx
- 国家税务总局就非居民企业间接转让中国财产的税务问题予以进一步明确.doc VIP
- 故事大全:科学家的故事_名人故事:名人科学家的故事.doc VIP
- 35kV开关柜安装施工方案.doc VIP
- 食材验收制度.docx VIP
文档评论(0)