毕业论文资料翻译原文-周杰伦
EPC-400 control unit
The EPC-400 control unit is designed and programmed to handle all necessary function of the cleaning system, in accordance with preset parameters.
The display on the control is used for indication of parameter numbers and values which can be visualized on request.
Normally the remaining time to next sludge discharge is displayed. Information on how to check the progress values is found in chapter 7.1.2
Fuse main switch ON/OFF
LEDs for alarm inputs (red)
Alarm input diagram
LED for stop sequence running (yellow)
LED for control program running (green)
LED for external preheater on (green)
External preheater ON/OFF push-button
Control program ON/OFF push-button
Sludge discharge push-button
Alarm reset
Function symbols
LED for main alarm (red)
LED for discharge failure (red)
Display
System output diagram
LEDs for system output (green)
Door lock
9.1.1 Fuses and related functions
Board fuse Functions influenced alarm EPC-400 front board A1 F1 10 V AC supply to the board Remote alarm display black(A4 when new fuse) F2 20 V AC supply to the board Analog/digital conversion Pt-100 inputs A 1-4
A2-6
C/F EEE F3 All outputs PS 42 EPC-400 rear board A2 F2 10 V AC supply to the board A 1-4 F3 Internal communications A 1-4 At restart with new fuse, switch power ON -OFF -ON
9.2 EPC-400 parameter functions
Selecting activities and parameter values is done inside the control unit cabinet. Before any parameter setting or supervision of parameters is possible, the mode selector must be set in “P” position.
Parameter numbers and values are selected by means of the four pushbuttons. The two upper ones are used for parameter selection and the two lower ones for setting the values.
The parameters are divided in:
Process parameters (C1): P1-P19
Installation parameters (C2): P20-P99
When setting parameters at start up set the installation parameters first and then proceed with the process parameters.
parameters number – increase
parameters number – d
您可能关注的文档
- 华师培训资料(作文).doc
- 2011年高考理科数学山东卷.doc
- 电离平衡部分高考题和练习.doc
- 怎样做完型填空和短文填词.ppt
- 13《古诗二首》.ppt
- 18.1变量与函数(含答案).doc
- 单片机报告1.doc
- 新视野大学英语第三册视听说答案.doc
- 郑州市机动车驾驶员培训协议.doc
- 预约挂号建卡说明.doc
- 福莱特玻璃集团股份有限公司海外监管公告 - 福莱特玻璃集团股份有限公司2024年度环境、社会及管治报告.pdf
- 广哈通信:2024年度环境、社会及治理(ESG)报告.pdf
- 招商证券股份有限公司招商证券2024年度环境、社会及管治报告.pdf
- 宏信建设发展有限公司2024 可持续发展暨环境、社会及管治(ESG)报告.pdf
- 品创控股有限公司环境、社会及管治报告 2024.pdf
- 中信建投证券股份有限公司2024可持续发展暨环境、社会及管治报告.pdf
- 洛阳栾川钼业集团股份有限公司环境、社会及管治报告.pdf
- 361度国际有限公司二零二四年环境、社会及管治报告.pdf
- 中国神华能源股份有限公司2024年度环境、社会及管治报告.pdf
- 广西能源:2024年环境、社会及治理(ESG)报告.pdf
文档评论(0)