水电站常用科技句子
在传真上有一些句子:
1.Reference is made to your letter CTGPC VS/04/04 dated March 25,2004 regarding new program and schedule of the second training. (以下内容为
2.We are presently checking all chances of possible new early arrangements and will send a new proposal as soon as possible. Currently we see no chance to start such training within next month.
3.As soon as a new training schedule is fixed we will send the respective invitation letter for visa application to the given address. For an early action at that time enclosed please find in advance one draft of such invitation letter. Please check if it is correct.
4.Enclosure:
5.This letter follows the discussion during Pit 3 maintenance meeting on Monday March 29th, 2004. The following guidelines were agreed during the meeting:(以下内容已在会议上通过)
6.Typically, this kind of nameplate have been installed on the slip ring housing of the generator. (通常,
7.Please provide your decision on the subject soon,
8.Please be informed about several visitors during the following weeks as follows:
9.The purpose of the visit is partly VGS internal discussions, discussions with Baja, and of course discussions with CTGPC, TGHP and TGT about the subjects of common interest.
10.VGS will take care of all the transport and accommodation arrangements of the groups and will host these visits.
11.we refer to your correspondence CTGPC 04/01 dated 2004-02-13 and we wish to inform about the progress on this issue. (总称)互通的信件,函件
12.We kindly ask you for a meeting next week to discuss further step’s
13.ALSTOM has not been informed about this, but we will check this as soon ALSTOM commissioning engineer get access to this unit.(进入)
14.The actual installation cannot guaranty the safety operation of the unit in case of emergency stop or load rejection.
15.please find attached a complete list with all the technical data’s, alarms, trip settings and values after commissioning of unit 10 Pure water system.
16.we have recorded the unit will be stopped for maintenance dur
您可能关注的文档
最近下载
- 中央空调系统清洗维修保养合同协议书(详细版).doc
- (ppt)苦菜花.ppt
- 免疫接种必须与选修答案-2024年全国疾控系统“大学习”活动.docx VIP
- (统编2024版)历史七年级上册全册知识点.docx
- 2023-2024在线网课《信息检索与科技写作( 理大)》单元测试考核答案.pdf
- 中医院重点专科儿科三年发展规划.docx
- 天津市河西区2023-2024学年七年级上学期期中语文试题(含答案).docx VIP
- 第九讲种质资源的保存ppt课件-教材.ppt VIP
- YDT 3762-2020 大数据 数据挖掘平台技术要求与测试方法.docx
- 2.1 网络改变世界 作业 初中道德与法治 人教部编版 八年级上册 (2021年).docx
文档评论(0)