万级净房设计及概念.pptVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
万级净房设计及概念

CLASS 10K CLEAN ROOM DESIGN This is the class 10K clean room design which I had completed for our Wafer Probe. We just do some modification to existing class 60K system to meet the Wafer Probe class 10K requirement. Actual reading taken was below 1K since we commission the system. (A) The dust control in the production floor will depend on the following : 1) Nos of air change. (This will help to filter off the airborn dust particles in the air) 2) Efficiency of the air filter. ( Select the right filters to do the right job.) 3) Avoid stagnant flow area.? (To avoid dust particle accumulate in one particular area) 4) Supply Laminar air flow. (To allow dust to settle on the floor and clean by House keeping thus prolong the service life span of the filter) 5) The return grill must be located in the B/E if B/E and F/E are together. (To ensure the recirculated air flow direction is flow from clean area to dirty area) 6) Good house keeping. (To get rid of settled dust) 7) Air shower for entrance. ( To reduce dust carry by people into the production floor) 8) Maintain positive static room pressure to outside.? (Prevent external dust to penetrate into production floor) 9) All gap in the filters must be sealed. (To achieve proper filtration of dust) 10) Good exhaust system for process that generate dust. (To avoid overloading of the AHU filtration system) 11) Avoid storing of dust generated material (eg.cardboad) in production floor. ? (To reduce the dust particles in the production floor) 12) All make up air must be filtered before going into the AHU.? (To avoid overloading of the AHU filtration system) CLASS 10K CLEAN ROOM DESIGN (B) The RH/Temp control will depend on the following : ????? -------------------------------------------------- 1) Maintain positive static room pressure to outside. (Prevent external moist air to penetrate into production floor) 2) Correct chilled water temp in the AHU. (To make sure the moisture in the recirculated air can be co

文档评论(0)

xy88118 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档